第十七条本办法规定的滞报金起征日如遇法定节假日,则顺延至其后第一个工作日。
Article 17 If the starting date for collecting the surcharges for delayed declaration as prescribed in these Measures is a legal holiday, it shall be postponed to the first following working day.
外教工资发放时间为每月15日发放上月工资,如遇节假日则顺延至下一个工作日。
The pay day for foreign teachers is on the 15th day of each month; in case of holiday, it shall be automatically postponed to the first work day following the holiday.
发包人没有及时检查的,承包人可以顺延工程日期,并有权要求赔偿停工、窝工等损失。
If the employer fails to inspect the same in a timely manner, the contractor may appropriately extend the project period and is entitled to claim damages for work stoppages, work delays, etc.
在这些情况下,交货日期可相应顺延,但只有当这些情况严重影响到合同的履行时方可适用。
In these circumstances the delivery date shall be extended for the period of their duration but only so far as the circumstances affected considerably the execution of the Contract.
由于天气不好,我们决定将启程顺延到下周五。
We've decided to put off our trip till next Friday, owing to the bad weather.
上述竣工日期,如遇下列情况时,应相应顺延期限。
In case meeting with the following conditions, the above completion date should be delayed.
如果只是工程的一部分受到影响,这种顺延仅适用于受影响部分。
If only a section of the works is affected the Defects Liability Period shall be extended only in respect of that section.
未收到定金,设计人有权推迟设计工作的开工时间,且交付文件的时间顺延。
If the down payment is not received, the designer is entitled to put off the time of commencement of design work, and postpone accordingly the time of delivery of documents.
扩建部分的屋脊顺延着老建筑的山墙面形成了环形,在基地中心创建了一个庭院。
The roof ridge of the extension will align with the gables of the old building, creating a looping form that will form a courtyard in the heart of the site.
如悬挂八号风球或以上,或黑色暴雨警告讯号发生时,活动将顺延至下一日举行。
If typhoon signal no. 8 or Black Rainstorm signal is hoisted, the activity will be postponed for the next day.
如果你只是简单的继承一个类而不做其他的事情,那么这个基类的方法便会顺延到衍生类中。
If you simply inherit a class and don't do anything else, the methods from the base-class interface come right along into the derived class.
季度考核,对当季度的工作表现进行考核,考核实施时间为下月的1 ~5日,遇节假日顺延。
Quarter assessment, assess the work performance in the quarter, the assessment date is September 1-5 and will be put off if it is holiday.
小径的路线没有顺延基地的坡度,而是分成了几个阶梯式的标高,通过之字形道路进行连接,避免碰到树木。
Rather than sloping to follow the Angle of the terrain, the route is broken up into stepped levels that zigzag across the ground to avoid touching trees.
如果我们正讨论一篇文章,并发现需要更多时间来继续,我们通常会把讨论延长到下一次课并且顺延后面的讨论。
If we find that we need more time for a paper once we are discussing it, then we will typically extend the discussion to the next session and delay subsequent sessions.
如果我们正讨论一篇文章,并发现需要更多时间来继续,我们通常会把讨论延长到下一次课并且顺延后面的讨论。
If we find that we need more time for a paper once we are discussing it, then we will typically extend the discussion to the next session and delay subsequent sessions.
应用推荐