人工顶管施工是穿越铁路、河流、公路等障碍物的最佳施工方法。
It is the best construction method to pass through such barriers as the railway, river, highway, etc.
目前,大直径泥水平衡顶管掘进已成为城市给排水水管、电力管线工程等首选的施工方法。
At present the large diameter slurry pipe jacking is the preferred construction method in project of urban water supply and drainage pipe and electric power pipe.
为了严格控制既有环线区间隧道的沉降,确保环线地铁运营安全,首次采用了顶管作超前预支护。
In order to control the subsidence of the interval tunnel and guarantee the safety of operation strictly, pipe-jacking is used as pre-support for the first time.
微型顶管隧道作为一种非开挖地下管线敷设技术,在城市地下管线改造中日益显示出巨大的优越性。
As a trenchless technology for laying pipeline, pipe-jacking tunnel technology is increasingly displaying the enormous superiority in pipeline reconstruction.
分析了小口径顶管掘进机的社会经济效益和推广前景。
The social and economical benefits and extending prospect of the machine are analyzed.
在采取了相应的有效措施后,顺利完成了顶管施工任务。
After taking the proper measures, the construction of pipe pushing has been successfully fulfilled.
针对不同的工程类型,探讨顶管穿越石方爆破的具体方法。
According to different types of constructions, the concrete methods of rock blasting technology of pipe pushing are discussed.
长距离顶管施工中为减小顶进阻力通常采用注浆减摩措施。
Injecting slurry is usually used to reduce the jacking friction in long-distance pipe jacking.
采用有限元法分析了曲线顶管施工对管节和土体的影响效应。
The influence domino effect for pipe and soil caused by construction has been analyzed by using FEM.
提出了长距离直线和曲线顶管施工防止管道失稳的控制措施。
Finally, several control measures are proposed to avoid failure for long-distance linear and curvilinear pipe jacking construction.
顶管施工引起的管道周围土体移动会对相邻地下管线造成危害。
The neighborhood buried pipelines will be damaged by movements of soil around the pipes induced by pipe jacking.
曲线顶管施工技术以其特有的优势和应用领域,越来越受到重视。
Because of the advantages and application fields, curved pipe jacking technology is paid more and more attention.
通过二维和三维有限元计算了顶管施工产生的土体变形和土体应力。
The deformation and stresses of soil by pipe-jacking are calculated with 2d and 3d finite element methods.
大口径长距离顶管施工顶进推力过大是困扰顶管施工多年的技术难题。
The construction of Pipe Jacking is beset with difficulty due to the large propulsive force for several years.
利用半解析单元法将顶管施工中三维土运动问题转化成一维数值计算。
By making use of the semi analytical element method, the three dimensional soil movements problem of pipe jacking is transfered to a one dimensional numerical calculation.
顶管机中,小车置于机箱中部的导轨上,油马达和联接器置于小车内。
In push bench, a trolley is arranged on the guide rail in the middle of the machine case, an oil motor and a coupler are arranged in the trolley.
对我国现有3套顶管机进行了顶推力计算,对主电机容量进行了校验。
Pushing force calculation and main motor capacity calibration are conducted for the three push bench pipe mills currently used in the country.
为了确保大堤安全,必须开展顶管施工期间和工后的长江大堤安全监测。
In order to ensure the safety of the Yangtze levee, safety monitoring during pipe jacking and afterwards is necessary.
通过建立三维有限元模型,研究了曲线顶管施工过程中地表的变形规律。
The deformation of ground surface during the construction of curved pipe-jacking is studied with 3d finite element methods.
文章通过昆明市某顶管工程实例,介绍了开敞式顶管施工的主要施工工艺。
The article introduced the main construction technique of open top pipe construction through a top pipe construction project instance of Kunming.
土压平衡式顶管掘进机机头泥土仓土压力控制是顶管工程中最关键的技术之一。
Soil pressure control is one of the most important technology of pipe pushing engineering with earth balance shield machine.
随着环境问题越来越受到重视,作为非开挖的顶管施工技术应用也越来越广泛。
With the environment getting more attention, the use of not-dig pipe jacking technology has become more extensive.
本实用新型涉及一种用于地下铺设管道的微型顶管机,属于通信施工技术领域。
The utility model relates to a mini-size push bench for underground pipe laying, which belongs to communication construction technical field.
文中结合实际工程,介绍了人工挖土顶管方法的设计与施工及关键施工技术要点。
According to an engineering case, the paper introduces the design and key points of construction of pipe-jacking techniques.
研究结果表明,水平平行顶管施工时中间区域受到双重扰动,产生的地面沉降较大。
It shows that the ground settlement produced by middle zone is greater because of double disturbance during parallel pipe jacking construction.
对水平平行双线顶管之间的相互作用进行了分析,提出了横向扰动区范围的计算公式。
The interaction of two level parallel pipe jacking is analyzed; and the calculation of lateral disturbance scope is advanced.
分析表明,水平平行顶管施工时由于中间区域受到双重扰动,会产生较大的地面沉降。
It is shown that the ground settlement produced by middle zone is greater because of double disturbance during parallel pipe jacking construction.
算例分析表明,顶管施工引起地面产生三维变形,随着掘进机的顶进而不断产生变化。
As is shown in analytical calculation, ground deformation induced by pipe jacking construction is three-dimensional and changing with the jacking-in of shield.
算例分析表明,顶管施工引起地面产生三维变形,随着掘进机的顶进而不断产生变化。
As is shown in analytical calculation, ground deformation induced by pipe jacking construction is three-dimensional and changing with the jacking-in of shield.
应用推荐