其第一级上闸首人字门的淹没水深达35米。
The immersed water depth of the upper miter gate at first step is up to 35 meters.
对三峡升船机上闸首下沉式工作闸门布置进行研究。
The layout of upper head with lowering working gate of Three Gorges ship lift is studied.
三峡工程—临时船闸上闸首、下闸首船闸液压系统总成。
Three Gorges Project-Upper and lower lock heads for the temporary ship lock Ship lock hydraulic system assembly.
简述了三峡工程永久船闸六闸首边墙混凝土高温季节施工的温控措施。
Temperature control measures for side wall concrete construction in the sixth lock head of the permanent navigation locks at the Three Gorges Project during hot season are briefly given in the paper.
结合百龙滩水电站下闸首基础石方开挖工程,详细介绍了该技术的爆破参数计算。
The blasting parameter calculation of the technology is analyzed with the discussion on the rock excavation of the first foundation in next floodgate of Bailongtan hydroelectric power station.
每个闸首的2个子站互为备用,且同时投入运行,运行时只有一个子站的控制信号输出。
For every lock head, each of its 2 substations is a reserve one to the other, but these two substations operate concurrently and only one substation has control signal output.
每个闸首的2个子站互为备用,且同时投入运行,运行时只有一个子站的控制信号输出。
For every lock head, each of its 2 substations is a reserve one to the other, but these two substations operate concurrently and only one substation has control signal output.
应用推荐