• 一级闸首人字淹没水深达35

    The immersed water depth of the upper miter gate at first step is up to 35 meters.

    youdao

  • 三峡升船机闸首下沉式工作闸门布置进行研究

    The layout of upper head with lowering working gate of Three Gorges ship lift is studied.

    youdao

  • 三峡工程—临时船闸闸首闸首船闸液压系统总成

    Three Gorges Project-Upper and lower lock heads for the temporary ship lock Ship lock hydraulic system assembly.

    youdao

  • 简述三峡工程永久船闸闸首边墙混凝土高温季节施工温控措施

    Temperature control measures for side wall concrete construction in the sixth lock head of the permanent navigation locks at the Three Gorges Project during hot season are briefly given in the paper.

    youdao

  • 结合龙滩水电站闸首基础石方开挖工程,详细介绍了技术爆破参数计算

    The blasting parameter calculation of the technology is analyzed with the discussion on the rock excavation of the first foundation in next floodgate of Bailongtan hydroelectric power station.

    youdao

  • 每个闸首2个子站互为备用,且同时投入运行,运行时只有个子站的控制信号输出

    For every lock head, each of its 2 substations is a reserve one to the other, but these two substations operate concurrently and only one substation has control signal output.

    youdao

  • 每个闸首2个子站互为备用,且同时投入运行,运行时只有个子站的控制信号输出

    For every lock head, each of its 2 substations is a reserve one to the other, but these two substations operate concurrently and only one substation has control signal output.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定