• 所述的矩形钢管柱的上部开有用于安装高强螺栓的安装孔。

    A mounting hole for arranging the high strength friction grip bolt is arranged at the top of the rectangle steel pipe column.

    youdao

  • 对钢管柱节点的设计进行了讨论,使其在实际施工中更具可实施性。

    The design of the steel tubular column joints is also discussed, which makes it more operable in actual construction.

    youdao

  • 在C型钢梁(3)与方钢管柱(1)之间可以设置自攻螺钉(7)的连接。

    The C-shaped steel beam (3) and the square steel tubular column (1) can be connected by self-tapping screws (7).

    youdao

  • 因此,对方钢管柱—工字钢梁节点性能研究具有重要的理论意义和工程应用价值。

    Therefore it has important academic significance and application value for civil engineering to the research of the connections between the steel tube columns and H shape steel beams.

    youdao

  • 北京首都国际机场新航站楼t3b工程中,钢筋混凝土环形梁是支撑巨型钢管柱的转换梁。

    In Terminal T3B Project of Beijing Capital International Airport, the reinforced concrete ring beam is a type of transfer beam supporting gigantic steel pipe columns.

    youdao

  • 对利用外粘钢板加固的钢管柱承载力进行试验研究,测定了不同加固方法对其承载力的影响。

    The influence on the bearing capacity of steel pipe column reinforced by different method with sticking steel plate is investigated by test.

    youdao

  • 本实用新型提供一种制作简单、施工方便、传力明确的矩形钢管柱的矩形钢管柱铰接柱脚节点结构。

    The articulated column node structure of a rectangular steel pipe column of the utility model has the advantages of simple production, convenient construction and unambiguous force transfer.

    youdao

  • 基于北京地铁四号线菜市口车站工程,介绍了钢管柱桩基的施工方案论证、技术措施和检测试验技术。

    Based on Caishikou Station engineering of Beijing Metro Line 4, construction plan demonstration, technology measures and test technology about pile foundation of steel pipe column are introduced.

    youdao

  • 结果表明,混凝土芯筒的剪力墙屈服后,其内置的延性加强构件(钢管柱)对结构的防倒塌有显著的作用。

    It is found that the ductile strengthen member (concrete fill steel tube) play an important role to prevent the structure from collapse after the shear walls partially yield.

    youdao

  • 采用方形空心钢管柱,分别对普通螺栓柱脚和带减震装置的柱脚进行低周往复加载试验,研究其恢复力特性。

    Dynamic cyclic test was performed to study the hysteretic behaviors of steel exposed-column base with and without the device.

    youdao

  • 以热轧无缝钢管柱为主要竖向承重结构构件,承担现浇钢筋混凝土框架剪力墙结构与钢屋架之间的结构转换作用。

    Hot-rolled seamless steel tube column, as the main vertical load-bearing member, plays the role of structure transferring between the cast RC frame shear wall and the steel roof truss.

    youdao

  • 而且目前主要使用的几种钢管混凝土柱—混凝土梁刚性节点将钢筋贯穿钢管柱,削弱了柱的承载力,且施工复杂。

    And several type concrete-filled steel tube columns to concrete beam connections through the steel columns, which weaken capacity of the column and complex construction.

    youdao

  • 通过对宝钢不锈钢项目进行现场压强测量试验,得出钢管柱中压强随高度变化曲线,对压强损失有了更为清晰的了解。

    Through onsite pressure measurement in Baosteel stainless project, the change curves of pressure accompanied with height in steel tube column are analyzed and the pressure loss is analyzed.

    youdao

  • 通过对宝钢不锈钢项目进行现场压强测量试验,得出钢管柱中压强随高度变化曲线,对压强损失有了更为清晰的了解。

    Through onsite pressure measurement in Baosteel stainless project, the change curves of pressure accompanied with height in steel tube column are analyzed and the pressure loss is analyzed.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定