按照既定的进度计划,直行并完成现场审核工作。
Plan, execute and complete audit fieldwork according to established schedule.
雇主的人员应有权在计划他们的活动时依据该进度计划。
The Employer's Personnel shall be entitled to rely upon the programme when planning their activities.
编制进度计划——分析工序顺序、工序持续时间和资源需求。
Schedule development-analyzing activity sequences, activity durations, and resource requirements to create the project schedule.
施工中的其他工作必须围绕着并适应施工进度计划的要求安排。
Other work must be centered on the construction schedule to adapt to the requirements of the arrangements.
综合应用进化算法和计算机技术,分两阶段对采掘进度计划实现优化。
Evolutionary algorithm and computer technology are used in combination in optimizing the mining scheduling in two phases.
还有很多事情要做,真的很讨厌这种不能按照自己的进度计划的生活。
There is lots of stuff to learn in the new place. I do need a car and regular my life.
本文对露天矿调整采剥进度计划,降低生产成本,提高企业效益作了阐述。
This article illustrates how open pit mine adjusts the striping schedule so as to lower down production cost and improve enterprise benefits.
本文首先对项目进度计划周期过长、项目进度超期的原因进行总结和分析。
First, this paper searched the reasons of the project's long duration and delaying.
亟待开发一种科学、可行的项目进度管理方法,以保证项目进度计划的实现。
So we need to focus on a new and systematic method to guarantee the in-time completion of the projects.
向甲方代表提供年、季、月工程进度计划及相应进度统计报表和工程事故报告;
Submit yearly, quarterly and monthly construction progress plan , corresponding statistics and report on the accident to the representatives of Party A.
介绍了硫磺制酸装置的组成、安装工艺及特点、施工进度计划和质量控制检查。
Composition, installation procedure and features, construction schedule and quality control and inspection of sulphur-burning sulphuric acid plants are reviewed.
职位总体目标:现场监督分包商,确保分包商安装过程符合杜尔标准及进度计划。
Job Objective: Supervise the subcontractor on site, make sure the subcontractor work meet Durr standard and satisfy the main time schedule.
提出了基于模糊网络进度计划的施工索赔工期分析,建立计算模型并使之程序化。
Give the analysis of construction claims construction period based on Fuzzy-network progress plan, and make it as a calculate model program.
项目实施时制定具体施工方案和项目执行过程中对安装进度计划并进行调整、控制。
When the implementation of the programme and formulate specific construction project on the installation progress plan and to make an adjustment, control.
项目实施时制定具体施工方案和项目执行过程中对安装进度计划并进行调整、控制。
Construction of the project implementation, to develop specific programs and project implementation process on the installation schedule and make adjustments to control.
项目实施时制定具体施工方案和项目执行过程中对安装进度计划并进行调整、控制。
Construction of the project implementation, to develop specific programs and projects in the implementation process on the installation schedule and make adjustments to control.
按照批准的工程总进度计划,协调各专业进度计划实际运转,并督促进度计划的实施。
According to approval project general schedule, coordinating the practical operating of every specialty plan, and supervising the carrying out of process plan.
负责按照业主要求,进行进度计划的编制和分级管理,并指导督办施工单位遵照执行。
Being responsible for programming and management in grade of operating schedule as per owner's requirement, guiding and inspecting the operating unit to carry it out.
如果挣值分析表明项目提前于进度计划,并且低于预算,则赶工是惟一一项可行的选项。
C. Crashing is only a viable alternative if earned value analysis indicates that the project is ahead of schedule and under budget.
工作说明和资源列表一旦创建完成,项目经理就应该制定项目进度计划。通常分以下几步。
Once the statement of work and the resource list have been created, the project manager should build a project schedule. This is usually done in several steps.
部署计划提供了一个详细的事件进度计划,人员职责,以及必要的事件依赖,以确保对新系统的成功完成。
The Deployment Plan provides a detailed schedule of events, persons responsible, and event dependencies required to ensure successful cutover to the new system.
该系统将包括(1)一个进度检测标准和(2)一个按照已确定目标进度计划的进度报告系统。
The system will consist of (1) a progress Appraisal Guide and (2) a system for reporting progress within established Target schedules.
进行了完工概率分析,较好地描述了施工进度计划的不确定性,为施工工期论证分析提供了依据。
The project completion probability is discussed, which fully describes the uncertainty of construction sequence schedule and provides basis for analysis of time limit.
本文首先探讨了导致延期的环境,基于责任制的延期分类,以及它们对项目费用和进度计划的影响。
This paper first discusses the circumstances that give rise to delays, the classification of these according to responsibility, and the effects they have on the project cost and schedule.
本文的研究能帮助程序开发人员在回归测试中确定需要重测的类和方法和成本估算及制定进度计划。
This research result in efficient regression testing by helping testers decide what classes and methods need to be retested, and in supporting cost estimation and schedule planning.
PERT技术的网络计划软件是基于编制工程进度计划要求而开发的一种新兴的工程管理技术软件。
Network planning software based on PERT technology is a new kind of project management software developed for compiling schedules for projects.
本文运用模糊综合评判理论在施工进度计划全过程管理中,使计划在施工过程中发挥更大的经济效益。
By means of the application of the theory of fuzzy comprehensive judgement for administration of engineering progress project in construction, economic proficiency will be boosted.
本文运用模糊综合评判理论在施工进度计划全过程管理中,使计划在施工过程中发挥更大的经济效益。
By means of the application of the theory of fuzzy comprehensive judgement for administration of engineering progress project in construction, economic proficiency will be boosted.