大多数一般的多于两台机床的流水车间作业排序问题均属于NPC问题,在实际生产中一般采用启发式算法。
Most flow shop sequencing problems with more than two machines belong to NPC problem. People often use heuristic algoristic algorithms to deal with them in practice.
基于交货期的模具车间作业调度问题是解决不同类型工件的加工排序,使其误工最少。
The mould manufacture scheduling based on due date is a problem of how to schedule operation processing sequence to minimize tardiness.
基于交货期的模具车间作业调度问题是解决不同类型工件的加工排序,使其误工最少。
The mould manufacture scheduling based on due date is a problem of how to schedule operation processing sequence to minimize tardiness.
应用推荐