依据测量结果,大坝首次灌浆处理获得成功,水库的渗漏水量比灌浆前减少60%。
The first treatment of cement grouting followed the determined results met with success by a 60% reduction of reservoir leakage.
简述了预应力混凝土灌浆工程的目的、灌浆材料及配合比,重点介绍了该工程的施工方法。
The purpose of construction of prestressed concrete grouting works, grouting material and proportioning are presented; the method of the construction is stressed.
简述了预应力混凝土灌浆工程的目的、灌浆材料及配合比,重点介绍了该工程的施工方法。
The purpose of construction of prestressed concrete grouting works, grouting material and proportioning are presented; the method of the construction is stressed.
应用推荐