介绍了该大跨高比且大跨度楼面次梁的设计。
The design of these large span-to-height ratio and large span secondary floor beams is presented.
综合分析表明,采用两横一纵的次梁布置方案较为合理。
The calculations show that the plan of two transversal and one longitudinal secondary beam planning is more reasonable.
框架梁为有粘结预应力混凝土宽扁梁,次梁采用无粘结预应力混凝土结构。
The bonded prestressed concrete structural wide flat beams were employed as the frame beams, while the unbonded prestressed concrete structure was applied to the junior beams.
论述了交叉梁系楼面结构体系中次梁间的相互作用,指出其中易出现的问题。
It discourses on the effects between the secondary beams in the floor slab of intersecting-beam system and points out the problems which happen usually.
考虑次梁的约束作用,推导了框架边梁的扭矩计算公式,分析了影响扭矩大小的主要因素。
Considering the restraining moment of the secondary beam, the paper deduces formulas for calculating torsional moment of edge beam of frame. Primary factors of affecting torsional moment are analyzed.
钢桁架作为转换构件,需承托楼板、连接次梁等,造成其受力特点与常规桁架相比有所不同。
Steel truss has its own feature about bearing floor, connecting to junior beam, etc, which make it different from normal truss.
本文基于二次梁理论给出了该几何非线性问题的理论解,其正确性通过有限元的数值计算结果得到验证。
In this paper, the geometric nonlinearity problem is analyzed based on the second beam theory, and a theoretical solution is proposed, whose accuracy is verified by FEM numerical simulation.
多层建筑物的钢框架是梁、次梁或桁梁,以及柱子的体系,用以承受结构的全部重力荷载和抵抗风荷及地震力。
The steel framing of a multi-storey building is a system of beams, girders or trusses, and columns, designed to carry all the gravity loads of the structure and to resist wind and earth-quake forces.
工程中采用了大跨度次梁预应力楼盖结构,有效地降低梁的截面高度,确保层高和建筑物总高度的要求,此外还采用了超长混凝土结构无缝设计等新技术。
The project has used large-span secondary girder pre-stressed ceiling structure, which effectively reduces the beam cross-section height and ensures the total height and building height requirements.
波纹钢腹板预应力混凝土梁桥是对传统的预应力混凝土梁桥的一次重大改进。
The prestressed concrete beam bridge with corrugated web has greatly improved the traditional prestressed concrete beam bridge.
双变径轮式抽油机是在继承常规游梁式抽油机优点的基础上设计而成的大载荷、长冲程、低冲次节能型抽油机。
A dual variable-diameter wheel pumping unit, which has long stroke and low pumping speed and large load capacity, is designed based on conventional beam pumping units.
针对闸门设计中常用的平面体系计算方法,分析了人字门钢面板参加主(次)梁工作的有效宽度。
In view of gate design in commonly adopt design method of plane system, the width of miter gate plate which participative working of the grider or beam is analyzed.
在结构承受较大初始荷载情况下,二次受力问题对加固梁的抗弯刚度、极限承载能力、延性存在一定影响;
When the initial load is big, the secondary load could influence the performances of CFRP reinforcement on all aspects as mentioned above.
艾氏冲击试验:用规定高度的摆锤对处于悬臂梁状态的缺口试样进行一次性打击,测量试样折断时冲击吸收功的试验。
The impact test of the pendulum is used to strike the notched specimens of the cantilever beam with a prescribed height, and the test of impact absorbing power when the specimen is broken.
对(次)硬梁-软半空间系统,梁的波速不再是临界速度,但也存在一个最小临界速度。
For (sub -) stiff beam-soft half space systems, wave speeds in beam are not critical any longer, but there is still a minimum critical velocity.
夏比(V型缺口)冲击试验:用规定高度的摆锤对处于简支梁状态的V型缺口试样进行一次性打击,测量试样折断时冲击吸收功的试验。
Charpy impact test (V gap) : the specified height of pendulum of the one-time blow to V notched specimens in beam state, test specimen is broken by the impact absorbing energy.
这个方法是建立在三次样条函数、梁振动函数(或三角函数)及变分原理基础上。
The method based on the cubic B-spline function, beam vibration function (or trigonometric functions) and variation principle.
重点讨论了预应力连续梁中次弯矩和轴向预压力对弯矩调幅的影响。
The emphasis of the paper is placed on the influence of the secondary moment and the axial prestress on the moment redistribution.
根据二次预应力连续梁的施工过程,提出了施工阶段的应力和变形分析方法。
For the construction process of twice prestressed continuous beam, the stress analysis and deformation analysis method during construction stage is provided in this paper.
取控制微分方程的齐次解作为梁段的有限元位移模式。
The homogeneous solution of the differential equation for the shear lag was taken as the displacement pattern of finite segment.
研究了具有三次非线性项的多阶梯梁的振动。
Vibrations of multiple stepped beams with cubic nonlinearities were considered.
通过虚功原理和单位荷载法分析了均布荷载作用下一次超静定梁的弹塑性加载及变形过程。
By using of virtual work principle and the unit-load method, the elastic-plastic process of loading and deflection of a beam with one degree of indeterminacy under an even load is analyzed.
试验验证表明,用二次规划求解的强迫转角法是进行钢筋混凝土连续梁弹塑性分析的有效方法。
Some experiments show that the "imposed rotation method" derived from quadratic programming is a useful method in elastoplastic analysis of reinforced concrete continuous beams.
隧洞衬砌采用针梁滑模、全断面一次浇筑的方法施工,可以减少工序作业,保证施工质量。
The tunnel is lined with the method "single placement for the full cross using needle beam sliding form", which can save construction procedures while ensuring quality.
通过对盐水环境中经历了0、5、15、25次冻融循环的钢筋混凝土梁式试件的粘结性能试验,研究了冻融循环对钢筋与混凝土粘结性能的影响。
Study was made on effects of freezing and thawing cycles on bond characteristics between reinforcement and concrete using beam specimens that experienced 0, 5, 15 and 25 freezing and thawing cycles.
本文采用改进的L -P法研究梁的强非线性振动,分析了超谐波共振和次谐波共振两种情况。
The modified Lindstedt-Poincaé method(MLP) is used t analyze strongly nonlinear vibration of beams. Attention is focused on the superhamonic and subharmonic resonances.
根据乌鞘岭隧道岭脊地段地质状况和二次衬砌实际受力特点,采用拟地基曲梁计算法来分析二次衬砌的裂缝宽度与间距。
This paper discussed the calculation analysis of the secondary lining crack width and spacing by using simulating soil curved beam's stress.
根据乌鞘岭隧道岭脊地段地质状况和二次衬砌实际受力特点,采用拟地基曲梁计算法来分析二次衬砌的裂缝宽度与间距。
This paper discussed the calculation analysis of the secondary lining crack width and spacing by using simulating soil curved beam's stress.
应用推荐