钢筋混凝土抗震框架梁的端部是保证结构抗震延性和塑性耗能能力的关键部位。
The ends of reinforced concrete beam in seismic frame are critical positions that ensure ductility and plastic energy dissipation capability of the structure.
工程实践表明,矩形钢管混凝土结构承载力高、抗震性能好,可显著减小柱断面,与钢框架梁连接方便。
The engineering practice shows that the using of concrete-filled rectangular steel tube members reduces the size of the columns, and it is a convenient way to connect steel beams and columns.
腋撑的上、下端分别和框架梁、框架柱刚接。
The haunch braces are connected rigidly with structural beams and columns.
钢桁架两榀一组,采用对称钢桁架梁组合结构。
Two steel trusses are in a group, and symmetrical steel truss beam combination structure is adopted.
笔者就编制铺轨架梁报价的几个具体问题提出了看法。
The paper also expresses its view on a couple of issues concerning the quotation of price preparation for track - laying …
介绍了预应力混凝土框架梁的设计过程及相关构造措施。
This paper introduces the prestressed concrete frame beams of the design process and related structural measures.
轻钢龙骨体系就是由这样的平面桁架梁组成的结构体系。
本发明涉及地板基板上以一体附着桁架梁的钢楼层板技术。
The invention relates to a deck plate technique with a truss girder attached integrally to a bottom plate.
顶部和底部双层框架梁结构,使机架更厚实沉稳,坚固耐用。
Double-layer framework structure makes the frame. more massive and steady, more firm and durable.
美国北领地震中,不少钢框架梁柱连接出现了意想不到的脆性破坏。
Many steel frames suffered from unexpected brittle fracturing of beam-to-column connections in the Northridge earthquake.
框架梁为有粘结预应力混凝土宽扁梁,次梁采用无粘结预应力混凝土结构。
The bonded prestressed concrete structural wide flat beams were employed as the frame beams, while the unbonded prestressed concrete structure was applied to the junior beams.
组合框架梁直用于住宅钢结构中,能起到减小框架梁梁高,增加建筑净空的作用。
The composite frame beams can reduce the height of frame beam and increase the headroom of the building in steel structure of residence.
预应力筋用量的增加、张拉控制应力的增大使预应力框架梁、柱的开裂荷载提高。
The crack load increases with the increase of the amount of the prestressing steel or the tensioning stress.
主要介绍了新达城广场钢管混凝土柱与钢筋混凝土框架梁的节点构造的设计思路。
This paper mainly gives informations about the train of thought in design of the joint construction of concrete filled steel tubular(CFST) columns with reinforced concrete beams in Sunteck Square.
在高烈度地震区,相邻框架梁跨度相差过大时,可以将短跨框架梁按照连梁设计。
In high seismic intensity zone, when the spans of adjacent frame beams have great difference, the short-span frame beam can be designed as coupling beam.
介绍了根据梁的强度要求和锅炉主框架的稳定要求进行主框架梁截面的选取方法。
The selection method of the cross section of the main frame beam is described according to the strength requirement of the beam and the stability requirement of the main boiler frame.
介绍框架-剪力墙结构设计中的一般原则、楼面体系的选用、框架梁柱布置等问题。
The general principle of frame shear wall structure design, selection of floor architecture, beam column layout, etc. are described.
详细介绍了支架便桥的构造、设计和该法架梁步骤,工程实践证明了该法的优越性。
This paper introduces the structure and design of the temporary bridge and the procedure of girder erecting. The engineering practice shows this method has many advantages.
“盆式”沉降使上部框架梁主要受剪力和弯矩作用,框架柱主要受轴力和弯矩作用。
The beams are principally suffered with moment and shear force and the columns principally suffered with moment and axial force under basin-shaped settlement.
根据锚索和框架梁各自的特点,说明预应力锚索框架梁复合支护结构的边坡加固机制;
According to the characteristics of anchor and frame beam, the reinforcing mechanism of the support is discussed.
在人们认识了实腹式梁的受力特征后,逐步将其部分腹部材料掏空,形成了平面桁架梁。
Having known the characters of the solid abdomen beam, people begin to remove some material in abdomen of the beam, thus the plane truss beam is formed.
于上架梁的下方固定有顶杆和凹模,于下架梁上安装有其一端部至少有一个肩凸的型芯。
An ejector rod and a female die are fixed at the lower part of the upper beam, and a mold core is mounted on the lower beam. The end of the mold core has at least one shoulder.
随着巨型框架结构应用的日益增多,主框架梁柱的合理布置成为巨型框架设计的关键问题。
With the increase in use of mega-frame structures, the main frame beam-column reasonable arrangement becomes the key problem of a design.
对于大吨位高架梁,太阳辐射引起的温度效应无法忽略,并可能成为结构设计的控制因素。
The temperature effect on large tonnage fly over beam caused by solar radiation should not be ignored, which will become the controlling factor of the structural design.
先从梁柱节点受弯变形的机理入手,推导出钢框架梁柱焊接连接节点的初始刚度计算公式。
The formula calculating the initial stiffness of welded connection of steel frame was drawn according to bending deformation mechanism of joint zone of welded steel frame.
圆碳纤维增强塑料钢管混凝土柱与钢筋混凝土框架梁的节点,涉及一种建筑节点构造形式。
The invention relates to a node of carbon fiber reinforced plastic circular steel tube concrete column and reinforced concrete frame beam, belonging to a construction style of building node.
分析了柱上暗扁梁在楼盖中的作用,认为它不能起到框架梁的作用,应为柱上板带的一部分。
The analysis for the concealed wide-flat beams demonstrates that it belongs to the column strip and it does not possess the function of the frame girder.
在全预钢筋制混凝土框架梁柱干式暗牛腿节点中,钢筋混凝土暗牛腿是重要的竖向传力构件。
The hidden corbel is the vital supporting member in the dry beam-column connections in full precast concrete frame.
紫坪铺公路改建工程高边坡地质情况复杂恶劣,采取了钢筋混凝土锚杆框架梁对坡体进行锚固。
Owing to complicated and adverse geological conditions, the frame girder of reinforced concrete anchor bar was applied to reinforce the high slope of rebuilt access road.
通过工程实例,介绍应如何在施工实践中,采取各种有效措施以控制大跨度框架梁裂缝的产生。
Give some construction examples to introduce how to take some effect measures to control cracks of long span in RC frame beam.
应用推荐