公开记录表明,Yorco雇用的按小时计酬的工人数量与Zortech大致相同,但每年付给这些工人的工资总额要高得多。
Publicly available records indicate that Yorco employs roughly the same number of such hourly wage workers as Zortech does but spends a far higher total sum per year on wages for such workers.
Yorco和Zortech是两家雇佣大量按小时计酬的全职工人的公司。
Yorco and Zortech are two corporations that employ large numbers of full-time workers who are paid by the hour.
备份条件:指定自动备份应在何时计划备份。
Backup criteria: Specifies when automatic backup should consider scheduling a backup.
eval函数允许字符串代码的运行时计算。
The eval function permits the run-time evaluation of a string of code.
当时计算机领域正经历着有趣的、时断时续的变革。
The field of computing was going through interesting, discontinuous changes at that time.
这些临时计划阻碍了快速检索、访问和重用资产。
Such makeshift arrangements make it difficult to find, assess, and reuse assets quickly.
这家工厂工人按小时计酬,办公职员(人员)按月领薪。
The worker in this factory is paid by the hour and the office/clerical staff /worker is paid a monthly salary.
本文简要介绍了一些为Linux内核提供实时计算的技术。
This article gave a brief overview of some of the techniques used to bring real-time computing to the Linux kernel.
还是那些碰撞变得足够稳定能得以采集科学数据时计作开始?
Or is it the moment at which those collisions have become stable enough for real scientific data to be collected from them?
在导出时计算指定扩展的签名,从而确保只能装载导出的扩展。
A signature for the specified extensions is computed at the time of export to ensure only the exported extensions can be loaded.
本例中,我们将看到没有正确更新统计数据时计划是如何变化的。
In this example, we'll see how the plan changes when the statistics are not updated properly.
从上世纪七十年代起,以小时计费的模式就已成为行业计费标准。
Billable hours have been the standard way of doing things since the 1970s.
此外,还提供了一个表来说明当集群的大小改变时计算方法的改变。
Again, a table is provided to illustrate how the calculation changes as cluster size changes.
当家庭装备了智能仪表和实时计费系统,研究显示能源使用将会显著下降。
When homes are equipped with smart meters and real-time pricing, research shows that energy use typically drops.
沃尔沃目前正在成都建立一个组装工厂,同时计划在大庆再建一个工厂。
Volvo is building an assembly plant in Chengdu and developing a factory site in Daqing, though it has not announced plans for that facility.
XANDOR操作符通过操作多个XISCAN,来同时计算两个或多个等式谓词。
The XANDOR operator evaluates two or more equality predicates simultaneously by driving multiple XISCANs.
他们同时计算出上瘾用户去年泡在该网站的时间超过125小时,相当于超过一周时间。
They also calculated that the most addicted users have spent over 125 hours on the site during the last year - the equivalent of more than a whole working week.
现在对于这同一个二进制,将提取TSD中存储的散列值并与运行时计算的散列值进行匹配。
Now for this same binary, the hash value stored in TSD is extracted and matched with the run-time calculated hash value.
是否进行检查的规定应该实时计算机化,这样医生就能够在考虑是否要检查时看到相关数据。
Testing-decision rules should beintegrated through real-time computerization, so doctors can see the evidenceevery time they consider ordering a test.
添加的代码只是将开始时间保存为局部变量,然后在方法结束时计算持续时间并打印到控制台。
The added code just saves the start time to a local variable, then computes the elapsed time at the end of the method and prints it to the console.
计算出在线旅行社对总入住率的实际贡献率,同时计算出这一贡献所花费的酒店成本是多少。
Determine your actual contribution to total occupancy from the OTAs, along with how much this contribution costs your hotel.
然而,由于每次迭代都使用了相同编号的寄存器,因此您可以简单地在汇编时计算寄存器的编号。
However, since each iteration USES the same number of registers, you can simply calculate the register number at assembly time.
其他一些同样也意识到小时计费方式的局限性的公司,正在寻求新的方法来衡量他们所创造的价值。
Others, sensing the limitation of being paid by the hour, are trying to develop new ways to capture the value their work can create.
还是当他们首次相互碰撞,从而产生具有此次实践全部意义的激动人心的全新亚原子粒子时计作开始?
Is it the moment when they are first made to collide with each other, thus generating the exciting new sub-atomic particles that are the whole point of the exercise?
还是当他们首次相互碰撞,从而产生具有此次实践全部意义的激动人心的全新亚原子粒子时计作开始?
Is it the moment when they are first made to collide with each other, thus generating the exciting new sub-atomic particles that are the whole point of the exercise?
应用推荐