盾构扩挖法建造地铁车站能够很好地解决地铁建设中盾构过站的问题。
The problem of shield machine driving through a station in Metro construction can be well solved by combining shield-driven tunnelling with mining or open cut excavation.
我国已成功地用浅埋暗挖法修建了西单“三拱两层双柱”式地铁车站。
The metro station of "triple-arch, double-storey and double-pillar" has been built in our country by means of shallow buried subterranean excavation method.
研究结果表明,严格按照浅埋暗挖法的基本原理和技术要点进行隧道施工,可以有效地避免地表塌陷事故的发生。
Research indicates that if shallow-buried tunneling can be strictly kept to the principles and technical rules of shallow-buried tunneling method, ground subsidence can be avoided effectively.
而暗挖法受地质条件约束较大,施工速度缓慢。
Mining method is easy constrained by the geological conditions, and its construction speed is also slow.
采用浅埋暗挖法施工地下电缆隧道取代明沟开挖法,可避免阻断交通、污染城市环境。
It may avoid stopping transportation and polluting city environment to have excavation in the open replaced by shallow-concealed excavation for large scale underground cable tunnel construction.
为此,本文提出了在已建成的盾构隧道基础上,结合明挖法修建地铁车站的施工方案。
To this end, this thesis proposes a construction program based on the developed shield tunnel with combination of cut and cover method of construction of subway station.
修建铁路隧道的主要方法有矿山法、盾构法、沉管法以及明挖法,这大多在前面都有阐述。
The main methods of building railway tunnels are mining method, shield method, immersed method and cutting and covering method, most of which are expatiated in aforementioned passages.
目前国内外修建地铁车站的施工方法有明挖法、新奥法、盾构法和这三种方法的组合及变化形式。
At present, construction methods of metro station include cut and cover, NATM, shield driven method and their combination and changing forms at home and abroad.
在软土地基中采用浅埋暗挖法进行隧道施工,研究周围土体变形行为,寻求合理施工工艺具有重要意义。
When using STCM in soft soil foundation, it is important to research the deformation behavior of soil around and seek reasonable construction process.
本文介绍了湖南国际会展中心采用综合注浆法加固人工挖孔桩的工程实例,可供参考。
Case history of Hunan International Conference and Exhibition Center in improving man-dig piles by complex grouting method is introduced in this paper. It can provide reference for engineers.
结合苏州街站的设计与施工情况,对地铁车站使用PBA法暗挖施工时的施工工法进行了分析研究。
With the design and construction conditions of Suzhoujie station, the author analyzes and studies the construction methods with PBA underground cut construction method in metro station.
西安地铁2号线钟楼站是一座非典型的分离岛式车站,明暗挖相结合; 车站线间距大,左右线站台分离,站台采用暗挖工法。
Bell Tower Station on Xi'an metro Line 2 is a separated-island-platform station constructed by using both cut-and-cover and mining methods.
介绍暗挖隧道曲线导向测量方法——弦线支距法和切弦线支距法的原理及应用。
This paper introduces the theory and its application of the curvilinear guided survey methods in concealed excavation of tunnels, such as chord offset method and tangent offset method.
1956年,位于法瑞边境日内瓦附近的欧洲原子核研究所把范德梅尔先生从飞利浦挖了过来,飞利浦是荷兰一家巨型工程公司。
Europe's main nuclear-research institute, which sits on the Franco-Swiss border near Geneva, poached Mr Van der Meer from Philips, a Dutch engineering giant, in 1956.
新管幕工法是我国引进的一种新型地下结构暗挖工法,该工法以沿结构边线顶进大直径钢管为基础,逐步形成大断面地下结构。
The underground structure gradually forms by compressing a serious of great diameter steel pipes into the ground used as a foundation along the edge of the structure.
新管幕工法是我国引进的一种新型地下结构暗挖工法,该工法以沿结构边线顶进大直径钢管为基础,逐步形成大断面地下结构。
The underground structure gradually forms by compressing a serious of great diameter steel pipes into the ground used as a foundation along the edge of the structure.
应用推荐