报价以双人房为基准,如单人住宿要在双人房的基础上增加20% - 50%的费用。
Price quotes usually assume double occupancy, with supplements for singles ranging from 20% to 50% of the double-occupancy rate.
由于没有基础市场报价,与这些股票相关的期权也无法交易。
Options traded on these shares also cannot trade - there is no underlying market to quote them against.
我们所报价格是以海运为基础的。所以,因货物以邮包方式寄发而产生的任何额外费用应由买户负责。
As our quotation is based on sea delivery, any extra charge for dispatch by parcel post should be borne by buyers.
这个报价是我们在精打细算的基础上得出来的。
股票报价、聊天、体育赛事比分以及很多应用程序都将得到广泛的应用,而且不会对基础设施造成太大的压力。
Stock quotes, chat, sports scores, and many other applications will work without pain throughout the infrastructure.
这是一个好主意,以书面形式有一个明确的基础上进行谈判的初始报价的副本。
It is a good idea to get a copy of the initial offer in writing so as to have a clear basis for negotiation.
在上述研究成果的基础上,作者以J2EE为开发平台,采用MVC框架结构,开发出了一套注射模具报价系统。
Based on the above-mentioned research, a quotation system for Injection Mould has been developed on J2EE by adopting MVC as the framework.
在此基础上,探讨了我国二板市场应该采取何种交易机制,论证了做市商报价驱动机制是二板市场交易机制的首选。
Based on these, it discusses which trading mechanism should be chosen in our country's secondary board market with the conclusion that the market-maker rule should be the best choice.
同时,它也是材料价格动态变化的计价依据,施工招标标底、投标报价的材料费计价的基础。
Also it is the valuation criterion of material price dynamic variation and basis of the material valuation for bidding bottom of construction bid and tender quotation.
一般情况下海关在通关环节以其申报价格为基础确定完税价格。
Normally the declared price is approved as the base of the customs duty-paying value of the goods through clearance.
他们所要的报价是一些建在音频滤波器更稳定的对齐的硬件基础。
All they have to offer is some built in audio filtering and a more stable alignment hardware base.
分析了模具的价格构成,阐述了基于实例的模具价格估算方法,并在此基础上探讨了模具报价系统的实现方法。
The price composition of mould is analyzed in details and the case-based quotation method for mould is discussed. Meanwhile, the implementation of the quotation system for mould is introduced.
在此基础上,建立了概率统计诊断模型,判断投标报价低于成本的可能性。
On this basis, probability statistic model of judging whether bidding price under cost or not is established.
公路工程的投标报价不等于工程概预算,它是通过概预算方法工程细目的预期单价和费用,进而预测建设项目成本和在此基础上的利润。
The biding quotation method is researched in detail so as to put forward a perfect method which is helpful for the subsist and development of the construction cooperation.
汇率报价中作为基础的货币,即报价表达形式为每一个单位的货币可兑换多少的另一种货币。
The currency used as the basis for an exchange rate, eg. A foreign currency rate of exchange is quoted per single unit of the base currency.
报价是以出厂价为基础,不包含国内运费和出口费用。
The quotation is offered base on EXW, exclusive of carriage and FOB cost.
这是我们以船上交货为基础的价格单,所报价格没有约束力。
I have here our price sheet on an FAS vessel basis. The prices are given without engagement.
我们需要SG - 3级聚氯乙烯树脂,每月200- 240吨。请在圣彼得堡(俄罗斯)到岸价的基础上报价。
We need PVC resin SG-3 grade in quantity 200-240 mt per month. Please quote the price on CIF St. Petersburg (Russia) basis.
从基础的供求信息到厂家报价、市场报价、动态、分析、政策、技术等有针对性的网上信息服务。
From the base supply information quote, the market offer, dynamic state, analysis, policy, technique's etc.
所有部分灭失或损害均应以此项申报价值为基础按比例进行调整。
Any partial loss or damage shall be adjusted prorata on the basis of such declared value.
技术标的是投标工作的主要组成部分,而技术标的编制又是整个投标报价工作的基础。
Technical standards are the main constituent of bidding work, and the compilation of technical standards is the base of bidding.
本文首先介绍了水电建设工程特点、水电建设工程投标报价风险分析的现状与问题,在此基础上进行投标报价风险研究。
This paper introduces the characteristics of hydropower construction project and status and problems of bidding risk analysis, and then studies bidding risk on this basis.
如果客人下单数量每款没有达到其最小订单量,则其单价就要在原来报价的基础上乘以1.1倍。
If your order does not reach our minimum quantity per item, the unit price will be 10% higher than the usual price.
买卖报价价差是微观结构理论中最基础的研究领域,并且贯穿于微观结构理论研究的始终。
Bid ask spread is the most fundamental area of microstructure theory, and it runs through microstructure researching.
但在统一出清电价下,无论发电厂商是何种风险类型,其最优报价在形式上均为在其运行成本减去竞价失败损失的基础上再加上一个提升量。
Under uniform clear pricing method, no matter what risk type power supplier takes, in format, the optimal bid is its cost minus loss of failure, and then adds uplift.
但在统一出清电价下,无论发电厂商是何种风险类型,其最优报价在形式上均为在其运行成本减去竞价失败损失的基础上再加上一个提升量。
Under uniform clear pricing method, no matter what risk type power supplier takes, in format, the optimal bid is its cost minus loss of failure, and then adds uplift.
应用推荐