结合工程实际,主塔承台采用圆形钢板桩围堰施工,圆满完成了承台的施工。
In light of engineering practice, a round steel sheet pile cofferdam was used in the main tower caps and the construction of pile cap was successfully completed.
采取何种高效、优质、安全的施工方法完成跨海段非通航孔桥墩承台施工是东海大桥工程建设能否取得成功的关键之一。
An efficient, excellent and safe way to complete the construction of pier footings at the non-navigable spans over the sea is one of the key points for the success of the East sea Bridge Project.
夹江大桥主墩的水中大型承台是施工的难点之一。
Large bearing platform above the water is one of difficult points in the construction of Jiajiang bridge.
温度裂缝防治是大体积混凝土承台施工质量控制的一大难题。
The prevention and cure of temperature cracks in large concrete pier cap is a serious difficulty in quality controlling of construction.
变形影响深度约为承台板宽度的(1.8 ~ 2.5)倍。
The deformation influence depth is about 1.8 to 2.5 times the cap breadth.
压力容器的承台、吊耳或支腿应符合容器标准中的表格的要求。
Saddles, lugs or legs for pressure vessels shall be as per the tables in Vessel Standard.
杭州湾跨海大桥南航道桥主塔承台为哑铃形结构,平面尺寸大。
The pylon bases of the south channel bridge of Hangzhou Bay Sea-Crossing bridge are designed in shape of dumbbell structures that are extraordinarily large in plan.
因此,有必要对群桩基础厚承台的传力机理及设计方法进行研究。
Therefore, it is necessary to study the load transferring mechanism and the design method of pile group foundations.
在讨论桩基承台破坏机理的基础上,给出群桩基础设计的优化方法。
On the basis of discussing the damage mechanism of cushion cap, a method of optimum design for pile group foundation is put forward in this paper.
大跨连续刚构桥大体积混凝土承台浇注是桥梁施工的关键工序之一。
Casting mass concrete of pile caps in long-span continuous rigid frame bridge is one of the key processes during bridge construction.
此法计算简单,满足精度要求,适用于桩与刚性承台为铰结的情况。
This calculating method is simple and can satisfy requirements of accuracy. It is adaptable to the condition of connecting the piles to a rigid platform by hinged joints.
空间桁架模型理论认为,承台内部力流是沿桩柱间的空间桁架传递的。
The space truss model theory argues that the stress flow transfers along with the truss composed of piles and column.
柱式桥墩由承台、柱式墩身和盖梁组成,墩柱是桥墩的重要组成部分。
Column pier is made up of pile cap, pier body and cap beam, pier column is an important part of the pier.
结果清楚地显示,深承台板的载荷传递机制与相应的双向剪切破坏模式。
The results clearly illustrate the load transfer mechanism in the deep pile cap and the subsequent failure mode of two-way shear.
介绍沈阳公和斜拉桥主塔承台冬季施工的要点和实施中的主要技术措施。
This paper presents the construction highlights and principal technical measures adopted in the construction of pylon pier bases of Gonghe Cable Stayed Bridge in Shenyang in winter season.
通过埋设测试元件对承台土反力、桩身轴力及复合地基变形等进行了量测。
The pressure under cap, axis force along pile and deformation of foundation were obtained from these tests.
基于桩基承台的空间桁架传力机理,进行了承台斜压杆应力场的模拟试验。
Based on load transmission mechanism of space truss for pile caps, the simulation of compression struts of pile caps was tested.
最后,通过典型的工程事故分析说明了忽视“承台效应”所引发的严重后果。
Finally, the article analyzes and explains the serious consequence owing to neglecting 'pile cap effect' through the model project accident.
扶壁式轻型桥台是由台帽、耳墙、扶壁、胸墙、群桩承台、锥坡、裙墙组成。
The buttressed light type abutment consists of abutment cap, side wall, buttress, breast wall, group pile cap, conical slope and skirt wall.
TB真空循环脱气装置设备的基础是承载上部荷载的桩基承台钢筋混凝土结构。
Bearing upper load, a reinforced concrete structure with a pile foundation is the foundation of RH-TB vacuum recycling degassing installation.
研究结果对城市桥梁现行的独柱式四桩承台设计方法的改进具有一定的指导意义。
The test results provided us with guidelines for proper design of single columns supported by four pile cap used in bridge construction.
结果表明,对于厚度较大的承台,冷却水对降低混凝土最高温度的作用更加明显。
The result shows that cooling water makes a more obvious effect on reducing the highest temperature to the thicker supporting terrace.
施工承台封底混凝土时使用了水下不离散混凝土絮凝剂uwb,保证了施工质量。
The bottoming concrete in foundation construction USES non discrete concrete flocculation agent UWB to ensure the construction quality.
这种设计方法只考虑承台某一特殊截面上的受力,而没有考虑承台内部的完整力流。
This kind of design method has only considered the stress in a special section of pile caps, but has no a consideration of complete stress flow inside the pile caps.
东营港扩建工程为形成掩护水域和挡浪,后方承台采用预制钢筋混凝土挡浪板遮帘。
In order to form a shielded water area and keep out the wave in Dongying Port extension engineering, precast reinforced concrete wave boards were adopted in the rear platform.
介绍新长铁路长江轮渡北栈桥预应力钢筋混凝土管桩和承台施工方案的选定及实施。
The paper introduces the selection and execution of the construction plan of PC pipe pile and pile cap for the transfer bridge at north bank of Yangtze River on Xinyi-Changxin Railway.
该文以贵溪大桥水中承台施工为例,较详细地介绍了钢套箱的设计及避水施工技术。
Taking the construction of in-water base slab of Guixi Bridge as an example, the article introduces in more detail the design of the steel sleeve box and the technique of water-avoiding construction.
根据9个试件的试验结果,分析了钢纤维混凝土三桩厚承台的破坏模式与传力机理。
According to the test of 9 specimens, a failure model and load transfer mechanism of steel-fiber reinforced concrete (SFRC) thick pile cap with three piles is analysed.
根据9个试件的试验结果,分析了钢纤维混凝土三桩厚承台的破坏模式与传力机理。
According to the test of 9 specimens, a failure model and load transfer mechanism of steel-fiber reinforced concrete (SFRC) thick pile cap with three piles is analysed.