采购或生产制造开始之前,合同专业检验试验计划(itp)应充分明确检查、无损检验(nde)和性能试验介入点。
Prior to procurement or commencement of manufacture, the inspection, NDE and performance testing intervention points shall be adequately defined in a contract specific inspection and test plan (ITP).
供应商的检验和测试计划应在批量生产开始前至少30天提交给B认可。
The SUPPLIER shall prepare an Inspection and Test Plan (ITP) and submit it to B for approval no less than 30 days before start of serial production.
从1975年开始,通过采用先进的质量控制技术和检验设备的技术更新,威廉姆森阀门开始生产高质量的阀门和管件产品。
Williamson Valves produced high quality valve and fitting products by adopting advanced quality control techniques and innovative inspection facilities in 1975.
从1975年开始,通过采用先进的质量控制技术和检验设备的技术更新,威廉姆森阀门开始生产高质量的阀门和管件产品。
Williamson Valves produced high quality valve and fitting products by adopting advanced quality control techniques and innovative inspection facilities in 1975.
应用推荐