列出进程和线程的开始和结束时间。
此外,您可以设定开始和结束时间的视频声音,你要提取的。
Futhermore, you can set the start and end time of the video sound that you want to extract .
同时,尝试修改一下规则的开始和结束时间,从而更好地适用于测试场景。
Also, try modifying the rule start and end times to be more inclusive to your testing scenarios.
KDM和每一个播放列表相关联,规定正确的投影开始和结束时间。
A KDM is associated to each playlist and defines the start and stop times of validity for the projection of that particular feature.
后设置开始和结束时间的位置,它将启动和停止转换的时间,你想。
After setting the start and stop time position, it will start and stop conversion by the time that you want.
设定工作的开始和结束时间。早晨8点前和晚上7点后我都不会工作。
Start and stop-times for work. I don't work before 8 in the morning and I don't work after 7 o clock in the evening.
训练和比赛时间表。你期望的开始和结束时间以及球员们期望的时间等。
Training and game schedules. How you feel about starting and ending on time, what your attendance expectations are etc.
可以看到聊天记录的日期以及聊天记录的开始和结束时间,还可以看到是谁先开始聊天的。
You can see the date of the chat along with the start and end times of the chat as well as who initiated the chat.
您必须输入有效报告名称、有效的开始和结束时间,并且报告中至少应该包含一个部分。
You must enter a valid report name, valid start and end dates and have at least one section in your status report.
该字符串操作还从元素的“start ”和“end ”属性抽取活动开始和结束时间。
The string operations also extract event start and end times from the "start" and "end" attributes of the element.
如果载气压力与以前的压力不同但流量相同,你只有输入一个新的定时参数以确定一个峰的开始和结束时间。
If the carrier pressure is different from the previous one for the same carrier flow, you will have to enter new timing parameter for the beginning and ending of a peak.
ISO 10006中规定项目为“具有独特的过程,有开始和结束时间,由一系列相互协调和受控的活动组成。”
ISO10006 in the project as "a unique process that has the beginning and end of time, by a series of coordinated and controlled the activities of the composition."
您将注意到少数的几件事;备份ID(比如 000000000000bb000002000d),表删除操作的开始和结束时间(比如 20040705150008)及被删除表的DDL。
You will notice few things; the backup ID (eg 000000000000bb000002000d), dropped table start and end time (eg. 20040705150008) and the DDL for the dropped table.
LotusServer .Load记录开始时间和结束时间,并在测试结束时通知您。
Load keeps track of the start and end time, and it informs you when the test has completed.
开始时间、结束时间和摘要都显示在日历视图中。
The start and end times and summary are displayed in the calendar views.
通过记录,确认症状发病诱因和症状开始结束时间。
Keep a record to identify the triggers and timing of your symptoms.
根据可用时间和资源以及确信度,您可以决定基准确定工作的开始和结束时机。
Depending on the time and resources available and your confidence level, you can decide where the benchmarking exercise can begin and conclude.
通过记录,确认症状发病诱因和症状开始结束时间。这有助于你采取措施进行干涉以缓解症状。
Keep a record to identify the triggers and timing of your symptoms. This will allow you to intervene with strategies that may help to lessen them.
when元素包含两个属性:事件的开始时间和结束时间,两者都使用 RFC 3339时间戳格式。
The when element contains two attributes: a start and end time for the event, both in RFC 3339 time-stamp format.
dtstart和dtend类位于 title元素中编码了开始时间和结束时间的标记内。
The dtstart and dtend classes are on the tags that have the start and end times encoded in their title elements.
递推计算工序开始时间和结束时间,进而计算编码的目标值,并将其转化为适应值。
They are given for recursively computing the beginning or ending time of working procedure, computing each encoding target and transforming it as adaptive value.
“有关测试运行的信息”一节包含有关运行的一般信息,包括测试的名称、开始时间和结束时间以及运行测试的控制器。
The test run information section contains general information about the run including the name of the test, the start and end times, and the controller that ran the test.
与建造,在ac 3球员,你可以聆听到ac 3文件,设定开始时间和结束时间,分拆或减少任何一节关于ac 3文件按需要发放。
With the build-in AC3 player, you can listen to the AC3 file, set the start time and the end time, split or cut any section of the AC3 file as needed.
开始时间和结束时间之间的时间段与开始时间之前和结束时间之后的时间段具有不同的背景底纹。
The time block between your start and end times has a different background shading from the time blocks before your start time and after your end time.
该方法只需计算出结点最早开始时间和最迟结束时间,便可确定出网络图的关键线路。
This method only needs computing the earliest start -time and the lastest finish-time of the node. Thus you work it out.
该方法只需计算出结点最早开始时间和最迟结束时间,便可确定出网络图的关键线路。
This method only needs computing the earliest start -time and the lastest finish-time of the node. Thus you work it out.