“—般情况”栏内,工程名称应填写全称,与建设工程规划许可证、施工许可证及施丁图纸中的工程名称一致。
"- like situation" column, the names should be filled out the full name, project planning and construction permits, construction permits and Shi D drawings of the project name in the agreement.
第二条出租人就未取得建设工程规划许可证或者未按照建设工程规划许可证的规定建设的房屋,与承租人订立的租赁合同无效。
Article 2 a lease contract on a building constructed without a building permit or in violation of the building permit shall be void.
第二条出租人就未取得建设工程规划许可证或者未按照建设工程规划许可证的规定建设的房屋,与承租人订立的租赁合同无效。
Article 2 a lease contract on a building constructed without a building permit or in violation of the building permit shall be void.
应用推荐