根据本发明的建筑物还包括第二层2和地面层3,第二层2和地面层3与用作压载物的密封容器4成为整体。
The building according to the invention also comprises a second floor 2 and a ground floor 3 that are integral with a sealed tank 4 that serves as ballast.
根据本发明的建筑物还包括第二层2和地面层3,第二层2和地面层3与用作压载物的密封容器4成为整体。
The building according to the invention also comprises a second floor 2 and a ground floor 3 that are integral with a sealed tank 4 that serves as ballast.
应用推荐