• 文章诠释工程结算审核一般内容分析了签证索赔反驳

    This article annotates the general contents about the audit of the project cost, also emphatically analyzes the refutable measures against the confirmation and counterclaim of a project.

    youdao

  • 论述工程结算审核内容提出加强工程造价竣工结算审核有效措施

    The paper discusses the content of project audit settlement and proposes the effective measures for strengthening audit settlement of completed project.

    youdao

  • 根据初步结算信息审核工程量及其单价,承包商就此进行谈判,确保精确决算价。

    According to draft settlement information to audit the amount of project of works and to negotiate the remaining issues with the contractor to ensure accurate settlement.

    youdao

  • 建筑设备安装工程造价过程控制关键设计过程、施工过程结算审核过程中进行严格有效的控制。

    Construction equipment installation project cost control process, the key should be in the design process, construction process and settlement of the audit process for strict and effective control.

    youdao

  • 加强工程竣工结算审核合理确定有效控制工程造价重要措施

    It is important measure rationally determining and effectively controlling the project costs to enhance the settlement examination and verification of completed projects.

    youdao

  • 多数建设单位均将工作重点放在人防工程竣工结算审核上,忽视造价形成过程控制尤其是其中的关键环节的控制。

    Most construction units focus on the audit settlement of air defense projects, and ignore the control of the formation process of cost, especially the key aspects of the control.

    youdao

  • 本文介绍了与工程造价相关工程计量签证工程变更竣工结算审核几个环节的相关管理

    This paper introduces the management of such links as project measurement verification, project alteration and completion audit relating to engineering project cost,.

    youdao

  • 本文主要依据个人实际工作经验简要论述维修工程结算审核工作认识体会

    Based on the author's practical experience, this paper briefly discussed the knowledge and experience on the auditing of the budget and settlement of inspection maintenance engineering.

    youdao

  • 文章工程造价审核主要内容步骤作了简明阐述探讨了提高结算审核质量有效途径

    This paper briefly expounds main content and steps of auditing of project cost and discusses effective ways to improve the quality of budgeting auditing.

    youdao

  • 摘要]工程竣工阶段工程建设最后阶段又是工程最终造价的形成阶段,竣工结算审核是造价控制关键

    Abstract: Project cost control runs through the whole process of engineering construction, the completion phase is a key of control of cost.

    youdao

  • 负责项目公司工程发包招投标文件分包合同工程结算法律文件的审核

    The project company is responsible for the works contract bidding documents, the total package, sub-contracts, engineering, legal documents such as clearing the audit;

    youdao

  • 负责项目公司工程发包招投标文件分包合同工程结算法律文件的审核

    The project company is responsible for the works contract bidding documents, the total package, sub-contracts, engineering, legal documents such as clearing the audit;

    youdao