• 介绍了钢锭过程、切分段操作长度计算方法控制策略

    This paper introduces the length compute means and control method for cutting head, cutting end and mean cutting operation in bar roughing roll process.

    youdao

  • 整体浇铸柱采用传统在总装线船台分段合拢,再拉主机轴线定位安装的方法施工难度船台周期长

    Traditionally, the integral casted stern post is positioned according to engine′s axes after completing subassembly on the berth. This technology is executed difficultly and needs large berth period.

    youdao

  • 整体浇铸柱采用传统在总装线船台分段合拢,再拉主机轴线定位安装的方法施工难度船台周期长

    Traditionally, the integral casted stern post is positioned according to engine′s axes after completing subassembly on the berth. This technology is executed difficultly and needs large berth period.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定