成都地铁一号线一期工程区间隧道大多通过富水砂卵石地层,且含有少量大粒径漂石。
The first stage project of line 1 of Chengdu Metro mostly passes through water-rich sandy cobble ground, which contains a small amount of large boulders.
华北陆块南缘(河南段)出露的富碱侵入岩类集中分布于卢氏-确山一线。
The alkaline rich intrusive rocks outcropped in the south margin of North China landmass (Henan section) concentrically distributing Lushi-Queshan belt.
曼联的后卫线依然不整,但达席尔瓦兄弟都能打了。法比奥在对富勒姆的比赛中替补登场。
The Reds still have a depleted backline, but the Da Silva twins could both be available, with Fabio having come on as a substitute in the Fulham reversal.
作者对不喷煤时高炉操作线的计算和绘制方法进行修正,推导出富氧大喷煤时高炉操作线的计算公式。
Calculation and plotting methods of BF operation line without coal injection are modified, and calculation formulae of BF operation line with oxygen enrichment and high PCI rate are deduced.
作者对不喷煤时高炉操作线的计算和绘制方法进行修正,推导出富氧大喷煤时高炉操作线的计算公式。
Calculation and plotting methods of BF operation line without coal injection are modified, and calculation formulae of BF operation line with oxygen enrichment and high PCI rate are deduced.
应用推荐