该方法的外迭代为经典牛顿法,内迭代为用GMRES法不精确求解雅可比方程。
The outer iteration of this method is the classical Newton method, and the inner iteration is using GMRES to solve Jacobi equations inexactly.
如果您要在整个迭代期间都保持对集合的锁,那么其他的线程就会在锁外停留很长的一段时间,等待解锁。
If you are going to hold the lock on the collection during an entire iteration, then other threads may be stalled waiting for the collection lock for a long time.
但是,一些用户故事要比预期的难,这就意味着一些故事要被挪到下个迭代周期中完成,或者完外被排除在发布中。
But some stories will be harder than anticipated, which means that some work will need to be moved into later iterations or out of the release altogether.
提出了一种求解线性规划(LP)的改进的单纯形法,其迭代过程产生的一部分极点可能出现在可行域外成为不可行极点,因此称之为外点单纯形法。
This paper presents an improved (infeasible) simplex method for linear programming, in which some of vertex points, corresponding to the iterative process, can be out of the feasible domain of (LP).
为防止过多错误反馈造成译码失效,提出采用内、外双重迭代方式提高系统的鲁棒性。
Both outer and inner iterations are used to avoid too much error feedback which may cause decoding failures.
为防止过多错误反馈造成译码失效,提出采用内、外双重迭代方式提高系统的鲁棒性。
Both outer and inner iterations are used to avoid too much errors feedback which may cause decoding failure.
在交替迭代过程中,考虑到算法收敛较慢,一种称为向量外推的加速方法被采用。
During the alternate iteration, an acceleration method called as vector extrapolation was applied to the alternate iteration steps owing to slow convergence of the algorithm.
分析了小波双线性插值中高频外推阈值门限与重建图像峰值信噪比的变化关系,提出了峰值信噪比最大小波双线性插值迭代算法。
The variable relationship between the threshold of the extrapolation and its correspondent Peak of the Signal-to-Noise Ratio (PSNR) in the Wavelet Bi-linear Interpolation Algorithm is deeply analyzed.
若要检查当前迭代的计划外工作量,必须将报表的开始日期和计划结束日期设置为与当前迭代周期的开始日期和计划结束日期相符。
To review the amount of unplanned work for a current iteration, you must set the planned end date and the start dates for the report to match those of your current iteration cycle.
您将需要格外关注“剩余工时”、“计划外工作”和“要求概述”报表,以确保根据预期结果跟踪迭代。
You will want to pay extra attention to the Remaining Work, Unplanned Work, and Requirements Overview reports to make sure that the iteration is tracking against expectations.
您将需要格外关注“剩余工时”、“计划外工作”和“要求概述”报表,以确保根据预期结果跟踪迭代。
You will want to pay extra attention to the Remaining Work, Unplanned Work, and Requirements Overview reports to make sure that the iteration is tracking against expectations.
应用推荐