然而维修工作在2006年被外判振明工程。
The maintenance work, however, was contracted out to Chun Ming Engineering in 2006.
根据循简易程序办理的清盘个案外判计划,有400宗个案已予外判。
There were 400 cases assigned under the scheme for contracting out summary winding-up cases.
根据循简易程序办理的清盘个案外判计划,有400宗个案已予外判。
There were 400 cases assigned under the scheme for contracting out summary winding-up cases.
应用推荐