可能最大洪水计算成果关系到水电工程安全问题,必须引起高度的重视。
The calculation of PMF is very important to the safety of hydropower project, so we must pay more attention to it.
目前我国还没有一套较完整规范地推求可能最大洪水地区组成的计算方法。
Nowadays, there is still no normative method for ascertain of the local probable maximum flood combination.
对哈尔滨上游蓄滞洪区的分洪能力以及可能发生的最大洪水进行了计算和分析,得出的结论认为哈尔滨市未来仍有发生溃堤的可能。
Analysis of flood release capacity of upstream detention areas and the probable maximum flood reveals that the risk of levee-breach in Harbin city still exists.
对哈尔滨上游蓄滞洪区的分洪能力以及可能发生的最大洪水进行了计算和分析,得出的结论认为哈尔滨市未来仍有发生溃堤的可能。
Analysis of flood release capacity of upstream detention areas and the probable maximum flood reveals that the risk of levee-breach in Harbin city still exists.
应用推荐