本文讨论多目标凸参数规划的真有效解稳定性。
In this paper, the stability of proper efficient solution of multi-objective convex parametric programming is discussed.
给出一种确定线性参数规划问题有最优解参数之范围的方法;对一类较一般的参数规划解的稳定给出了若干充分条件。
This paper mainly studied optimal solutions distribution area of one new kind of parametric linear programming and its related theorem on a basis of some usual parametric LP problems.
图2:规划参数的更现实的分布。
Figure 2: a more realistic distribution for program parameters.
研究结论是,参数研究在所有生产规划或调整井定位的过程都非常重要。
We concluded that for any production program or adjusting the Wells location, the parameter study is very important.
特种变压器电磁参数的优化设计是一个带有等式和不等式约束,满足某种设计目标的非线性规划问题。
Optimization mathematical model of special transformer electromagnetism parameters is a nonlinear programming problem with equality and inequality constraints, to meet some certain design objective.
选择最优参数的过程即是对以均方根误差最小为目标的整数规划问题的求解过程。
The process of which is to solve the integer programming problem with the objective function that RMSE is minimal.
钢管订购和运输中的参数优化问题是个复杂的非线性规划问题。
It's a complex nonlinear programming question to find the optimization parameter in the Ordering and transporting of steel tube.
铣削加工有限元模拟研究为铝合金切削加工的工艺参数优化、刀具的优选和工艺规划奠定了基础。
The study has laid a base for material process parameter optimization, tool selection optimization and technics programming.
本文改进了带线性约束0 - 1二次规划问题的罚参数下界。
In this paper, penalty parameter for linearly constrained 0-1 quadratic programming is improved.
由于目标和参数的不确定性,模糊多目标线性规划的最优解不是唯一的。
The optional solution of fuzzy multiple objective linear programming is not unique due to uncertain goals and parameters.
对某一组规划参数(即环保除尘设备型式、清灰组织、除尘布袋纤维材料和织物构造、尘埃性质等)有一个最佳过滤速度。
There is an optimal filtration rate for a certain set of planning parameters, i. e., the type of dust removal equipment, dust cleaning, dust bag fabric and fabric structure.
作者基于分析和建立加工曲面的型面几何偏差与加工刀位规划参数的关系,提出几何误差的控制方法。
This paper presents the methods to control geometrical errors based on the establishing of the link between geometrical errors and the parameters of tool path planning.
模型参数用非线性规划的最优化方法进行估计,得到了计算液相当量混合系数的无因次回归方程。
The model parameters are estimated by the optimal method of nonlinear programming, and the equivalent mixing coefficient is regressed in a dimensionless equation.
针对峰值法中测量路径规划问题,提出了基于参数模型学习的神经网络预测器。
Aiming at measuring path planning by using peak value, neural network predictor based on parameter model is presented.
根据轨迹函数、规划参数可以计算出各坐标轴的瞬态运动参数。
Its geometrical parameter and planning parameter should be followed in calculating the transient motion parameters of all coordinate axes.
利用自适应进化规划同时优化规则基的结构和参数。
Adaptive evolutionary programming is used to optimize the structure and parameters simultaneously.
在确定优化参数和约束方程的基础上,借助线性规划模型进行福建省耕地利用结构优化。
Based on the determination of optimizing parameters and boundary equations, the cropland using structure in Fujian Province was optimized by the model of linear programming.
研究了风栅铝片三轴铣削加工中装夹方法、刀具选择、走刀规划以及切削参数确定方法;
The clamping means, cutter selection, tool path planning and cutting parameters determination using three-axis machine for aluminum windshield pieces were studied.
本文用多元回归分析和修正的数学规划方法估计公路运输企业前沿面生产函数的参数。
In this paper, the parameters of the frontier production function for highway transport enterprises are estimated with the regression analysis and revised mathematical programming methods.
提出一类模糊机会约束的随机期望值规划模型,该模型同时含有随机和模糊参数。
A stochastic programming model with fuzzy chance constraint is presented which has stochastic and fuzzy parameters.
在典型的参数算法中,有界搜索树和动态规划是常用技术。
Bounded search tree and dynamic programming are frequently-used techniques in parameterized algorithm.
结果表明,利用非线性规划技术可以进一步协调PSS参数。
Results show that the PSS parameter can be further coordinated by using the nonlinear programming technique.
讨论了区间参数非线性规划问题。
This paper considers the nonlinear programming problem of interval parameters.
对带有模糊目标集和模糊参数的广义目标规划问题,用模糊集合理论给出了相应的解决方法。
After generalized goal programming model is established, FGGP with fuzzy goal sets and fuzzy parameters are studied, the solving methods using fuzzy set theory for FGGP are provided.
传统方法中,产品设计或过程规划的参数设计一般先于容差设计。
In the traditional method, the design of products or the design of parameters in the process planning usually carried out before the design of tolerance.
传统方法中,产品设计或过程规划的参数设计一般先于容差设计。
In the traditional method, the design of products or the design of parameters in the process planning usually carried out before the design of tolerance.
应用推荐