• 其间用到实验工具包括调查问卷

    Instruments used in the research include questionnaires, pre-test and post-test.

    youdao

  • 实验部分组成:两英文写作写作。

    The experiment is composed of two pieces of writing for pretest and four passages writing.

    youdao

  • 逐点接近路基施工桩最普遍使用方法

    The approaching method spot by spot is the way generally used in measuring the side pile before the road bed construction.

    youdao

  • 试验数据包括调查问卷、一次前测一次成绩

    The instrumental tools involved in this study were three questionnaires and two tests.

    youdao

  • 实验过程主要包括,实验培训过程三个阶段

    The experiment includes three steps:the pre-test, the process of developing CC and the post test.

    youdao

  • 其次笔者对受进行外语学习者听力问卷调查听力前测

    Secondly, the EFL Learners' Listening Survey and the pretest were administered to the subjects.

    youdao

  • 学生分别进行名词可数性多选题两次后

    The two classes were given a pre-test and two post-tests in the form of multiple-choice questions on count and mass nouns.

    youdao

  • 每个进行三项——以及后紧接一周试。

    Each group was given three tests - a pretest, a posttest, and a test a week after the first two tests.

    youdao

  • 实验过程分为部分问卷调查课堂授课实验、后结果分析

    The experiment is divided into five parts: questionnaire, pre-test, class teaching, post-test and results analysis.

    youdao

  • 然而平均舒张前测方面,显示原本实验组对于血压值的控制优于控制组。

    The average diastolic blood pressure showed that the experimental group had a better health status than control group in pretest.

    youdao

  • 学期学期后学生完成了相同调查问卷,并进行英语口语前测和后

    The participants in this research project were secondary technical school students in four first-year classes in Beijing Technical School of Economics and Business.

    youdao

  • 实验实验后他们分别参加了一个个后,旨在检验两教学效果是否差异

    A pretest and two post-tests were given to both groups to see which approach was more effective in vocabulary acquisition.

    youdao

  • 利用新方法教授语法,笔者举行了一个,目的为了验两个班是否拥有同样的英语水平。

    After teaching the same grammar points, a posttest is held to see whether this method plays an important role.

    youdao

  • 实验我学院04设备专业03机电专业同时进行,采用“实验组对照组前测”的设计方案。

    The experiment is done in Grade 03 of Machinery and Electronics and Grade 04 of Machinery and Equipment apparently.

    youdao

  • 作者采用共同学习的小组模式分别进行,后问卷调查访谈等形式进行了将近个月实验来验证问题的提出。

    The author used Learning Together (LT)to make an experiment with pre- and post-test, questionnaire and interview for about four months to test and verify this study hypothesis.

    youdao

  • 分数明显高于的分数,后平均分前测平均分高出8.667分,而且标准差小于前测说明学生的整体水平提高

    The mean of post-test has improve by 8.6667 comparing to the pre-test, and the standard deviation of the post-test decreases, which implies students' average level improves.

    youdao

  • 代理商冷漠反应使教练决定先做一个这样可以确定是不是大部分的需要培训的代理商已经掌握好了,从而确定销售优先权

    Puzzled by the cool reaction of the agents, the trainer decided to give a pretest, which revealed that a majority of the trainees already know perfectly well how to set sales priorities.

    youdao

  • 教学实验通过学习风格调查表前测试卷挑选出实验受试,保证实验组控制组除了学习风格不同外,在性别、年龄、前测成绩等方面没有差异。

    They were chosen out of 99 students to make sure that the Experimental Groups and the Control Groups had no difference except their learning styles.

    youdao

  • 考古学份声明中,经放射性碳鉴定,环形巨石阵应该建造公元2400年至公元2200年之间的推几百年。

    The archaeologists said in the statement that radio-carbon dating put the construction of the circle of bluestones at between 2,400 B.C. and 2,200 B.C., a few centuries later than originally thought.

    youdao

  • 几十考古学就已经开始用一项叫做14的方法他们发掘的东西悠久

    For decades, archaeologists have used a technique called carbon dating to work out how old their finds are.

    youdao

  • 用放射性碳年法地震中丧生三名儿童遗骸进行检后,研究者确定洪水大约发生公元1920年。

    Radiocarbon dating of the bones of three children killed by the earthquake establish that the event took place around 1920 B. C.

    youdao

  • 经常修改时候提交开发期间运行套件(至少也是其中的相当的一部分)应该成为开发周期的一部分

    Run the tests often. When you update, before you commit, during development. Running the test suite (or at least a relevant portion of it) should be part of your development cycle.

    youdao

  • BI SRA变刚度厚度控制系统计型厚控系统监控馈厚度控制系统也是相容它们之间相互影响

    BISRA gauge control method and measure thick system and monitor, monitor and feed forward system are also compatible one another, but there are some influences of one on the other.

    youdao

  • BI SRA变刚度厚度控制系统计型厚控系统监控馈厚度控制系统也是相容它们之间相互影响

    BISRA gauge control method and measure thick system and monitor, monitor and feed forward system are also compatible one another, but there are some influences of one on the other.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定