• 高位前柱骨折多数需要手术治疗

    Most high acetabular anterior column fractures need to be treated with operation.

    youdao

  • 目的经髋前柱螺钉固定提供解剖学依据。

    Objective to provide the anatomic basis for the lag screw placement in the anterior column of the acetabulum.

    youdao

  • 目的为髋前柱拉力螺钉内固定提供解剖学基础

    Objective: to provide anatomical basis for the placement of lag screw in the acetabular anterior column.

    youdao

  • 结论合并前柱支持获得较好疗效原因不明确。

    Conclusion. The cause of the superior outcome in the group with anterior support is still unclear.

    youdao

  • 目的探讨前柱解剖学结构螺钉放置安全角度范围。

    Objective:To investigate the anatomical configuration of the anterior column of the acetabulum and to fine a safe path for screw placement into it.

    youdao

  • 我们设计一个新的手术技术完全通过后路达到前柱重建相同目标

    We propose a novel technique to achieve the same goals as anterior column reconstruction through an entirely posterior approach.

    youdao

  • 目的研究前柱拉力螺钉内固定技术中螺钉最佳进钉方向长度

    Objective: To study the best entry points, direction and length of screw in acetabular anterior column lag screw technique.

    youdao

  • 背景资料概要:使用技术后路重建前柱稳定性,可以使医生患者都更加便利

    Summary of Background Data. Reconstruction of the anterior column from a posterior approach could be easier for the patient and for the surgeon with this technique.

    youdao

  • 目的应用优化计算机辅助解剖测量技术经皮逆行髋臼前柱螺钉内固定术提供解剖学基础。

    Objective to investigate the optimization technique for computer aided measurement and provide anatomical data for the retrograde acetabulum anterior column screw percutaneously.

    youdao

  • 述框架具有前柱(13),一对用于病人大腿骨曲形(44)连接在所述前柱上。

    The frame also has a front column (13) on which a pair of padded curved bars (44) are connected for the upper leg bones of the patient.

    youdao

  • 结论前柱拉力螺钉技术具有创伤固定强度优点,在某些髋臼骨折应用具有明显的优势。

    Conclusions: acetabular anterior column lag screw technique has advantages such as low trauma, high strength of fixation, when being applied in some types of acetabular fractures.

    youdao

  • 目的研究前柱钢板内固定技术螺钉最佳进钉方向长度预防发生螺钉穿入关节内的严重并发症

    Objective to study the best entry points, direction and length of screw in acetabular anterior column plate technique, and to prevent the serious complications of screw penetrating the joint surface.

    youdao

  • 较大骨块通过分开前柱而使神经减压易使承受过大的载荷增加了骨块骨折与下沉的风险

    Larger grafts afford neural decompression through anterior column distraction, but may subject the graft and vertebral bodies to excessive loads, increasing graft fracture, and subsidence risk.

    youdao

  • 目的:探讨开窗法复位植骨内固定单纯行前柱复位内固定治疗前柱骨折合并顶区关节压缩塌陷治疗效果。

    Objective: Analysis of fenestration operation treatment of acetabular parastyle fracture with compressive articular surface of the acetabulum involving weight-bearing dome.

    youdao

  • 方法涉及血浆固相提取胰岛素,以及用荧光胺胰岛素进行柱前衍生

    The method involved solid-phase extraction of insulin from plasma and pre-column derivatization of insulin with fluorescamine.

    youdao

  • 希腊哲学家柏拉图在2,600年前写到亚特兰蒂斯的时候,将描述座位名字叫作赫拉克勒斯之柱海峡岛屿。”

    Greek philosopher Plato wrote about Atlantis some 2,600 years ago, describing it as' an island situated in front of the straits called the Pillars of Hercules. '.

    youdao

  • 希腊哲学家柏拉图在2,600年前写到亚特兰蒂斯时候,将描述座位名字叫作赫拉克勒斯之柱海峡岛屿。”

    Greek philosopher Plato wrote about Atlantis some 2, 600 years ago, describing it as' an island situated in front of the straits called the Pillars of Hercules. '.

    youdao

  • 下水测量船体尺度总长、两柱长、型宽、型、基线挠度

    Measuring hull's main dimensions: length overall(LOA. ), length between perpendiculars(LPP. ), breath molded(B. ), depth molded(D. ) and deflection before launching.

    youdao

  • 目的探讨髋臼投影螺钉放置安全范围

    Objective: to investigate the X-ray projection of acetabulum on its anterior and posterior column and to develop a safe area for screw placement.

    youdao

  • 结合工作实际介绍沧州市体育馆异形施工、施工施工质量控制管理

    Based on actual work, it introduced the quality control and management of the special-shaped column of Cangzhou Gymnasium before, during and after construction.

    youdao

  • 泥浆的有效浆压力凝前还是初凝后降低水柱压力,直接关系能不能在固井候凝过程中压稳地层流体、实现压稳防窜候凝。

    The time when the cement slurry's column pressure reduces to the water column pressure before or after initial set is directly related to whether or not formation fluids flow out during wait-on-time.

    youdao

  • 外包钢筋混凝土加固受压一个两阶段受力问题,包括加固加固部分

    The two-stage load of the reinforced concrete column with reinforced concrete cover involves two parts, one before strengthened and another after strengthened.

    youdao

  • 详细介绍了通过控制质量、焊材质量、焊前准备焊接参数完成转换焊接。

    This paper introduces the welding of transformation column by controlling the quality of master materials and welding materials, welding preparation, welding parameters and so on.

    youdao

  • 样本前处理采取凝胶色谱柱净化方法

    A gel permeation chromatography clean up method was introduced.

    youdao

  • 研究通过丹磺酰氯柱前衍生HPLC纳豆发酵过程中的生物进行检测

    Biogenic amines during the fermentation of natto was detected by HPLC, using precolumn derivatization with DNS-Cl.

    youdao

  • 本文研究HPLC辛胺-安息香柱前反应检测分析方法

    A new method of HPLC pre-column reaction detection for guazatine analysis was developed.

    youdao

  • 本文研究HPLC辛胺-安息香柱前反应检测分析方法

    A new method of HPLC pre-column reaction detection for guazatine analysis was developed.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定