在编制编组站阶段计划时需解决的一个核心问题是确定出发列车的车流来源。
The core of the phase plan of a marshalling station is to identify the source of the flow of departure trains.
梅河口火车站是全国48个一级编组站之一,日接发客货列车159列。
Meihekou Station is one of the 48 one of the marshalling yard, on the passenger and freight trains to 159.
方案II用摘挂列车送入结点站改编,普通货车再用小运转列车向编组站输送;
In scheme II, container trains are remade-up after hauled into a junction station in pickup and drop trains, and the remade-up trains are delivered to a marshalling station in transfer trains.
方案II用摘挂列车送入结点站改编,普通货车再用小运转列车向编组站输送;
In scheme II, container trains are remade-up after hauled into a junction station in pickup and drop trains, and the remade-up trains are delivered to a marshalling station in transfer trains.
应用推荐