全连铸电炉炼钢厂的多炉连浇问题实质是多工序的衔接匹配问题。
The essence of sequence continuous casting in EAF steel plant is the joining and matching of multiprocess of production and the key is to shorten tap to tap time on EAF.
全连铸生产是融科学技术和管理于一体的密集的、复杂的系统工程。
Full continuous casting operation is a highly integrated and complicated system engineering in which science, technology and production management are combined together.
论述了三明钢铁厂优化工艺结构,采取炼钢全连铸、轧钢一火成材、焦炉煤气置换等清洁生产技术;
In the Shanming Iron and Steel Works, the process structure was optimized by adopting continous casting, roll in one heat and replacement of coke-oven gas.
钢包内衬在使用至中、后期进行喷补维护,在延长包龄、适应全连铸快节奏生产需求的同时,降低了钢包内衬耐材消耗。
Meanwhile, gunned lining can reduce the refractory consumption on ladle liner and prolong the life span of the ladle and adapt to the fast speed CC production.
钢包内衬在使用至中、后期进行喷补维护,在延长包龄、适应全连铸快节奏生产需求的同时,降低了钢包内衬耐材消耗。
Meanwhile, gunned lining can reduce the refractory consumption on ladle liner and prolong the life span of the ladle and adapt to the fast speed CC production.
应用推荐