从作业顺序图出发,定义了作业的序关系。
According to task sequence diagram, this paper defined sequence operations between different tasks.
作业顺序即为完成工作的每一步的具体描述。
The work sequence defines the step-by-step order in which an operation is to be performed.
NET提供标准的作业顺序,允许样板化的呈现是装置特定的。
NET provides a standard sequence of operations that allow templated rendering to be device-specific.
进而,也可以根据作业器具履历信息等的履历信息决定作业顺序。
The operating procedure may be determined on the basis of device-usage hysteresis information as well.
为适应资源性能的动态性,一个参数应用被分成若干作业顺序调度。
To adapt to the dynamic of resource capabilities, a parameter application was divided into some jobs scheduled sequentially.
严格按照《龙门架使用说明书》的操作规定条件和作业顺序进行安装。
In strict accordance with the "Longmen shelf manual" operation conditions and operation sequence installation.
简要介绍了钢结构框架焊接过程中材料选择、工艺参数的确定及作业顺序。
This paper introduces briefly how to select weldding-materials, technical reference and working sequence during the weldding process.
露天采矿遵循与地下采矿相同的作业顺序:钻孔、爆破、装载并运走废料和矿石。
Open-pit mining follows the same sequence of operations as underground mining: drilling, blasting, and loading and removing waste and ore.
露天采矿遵循与地下采矿相同的作业顺序:钻孔、爆破、装载并运走废料和矿石。
Open-pit mining follows the same sequence of oprations as underground mining: drilling, blasting, and loading and removing waste and ore.
本文通过对立体库总体工作过程的分析,找到了影响堆垛机运行效率的两大因素,库位的分配和作业顺序。
The general work process of the system is analyzed in this article and two big factors that affect work efficiency of stacker have been discovered — distribution of shelves and work sequence.
本文介绍了铜阳极板定量浇铸和浇铸作业顺序控制系统的设计思想、控制系统结构、控制方式及其实现方法。
The system designing idea, the system structure, the control method and the realizing way of copper anode Platequantitative casting and casting operation sequence control are introduced.
托顿通常在课桌旁走来走去,按照作业纸上问题的顺序一个接一个地向学生提问。
Totten usually walked up and down the rows of desks requesting answers from student after student in the order the questions had appeared on our homework sheets.
你可能必须帮助年龄较小的孩子安排他们做作业的顺序,但重要的是,等他们小学结束时,要让他们习惯成自然。
You probably have to help younger children plan their session, but it's important that by the end of primary school it's second nature.
联邦优化器还使t - ETL解决方案更具有可适应性,因为当作业中数据特征发生变化时,最佳连接策略和链接顺序也可能随之变化。
The federated optimizer also allows the T-ETL solution to be adaptive, as the best join strategy and link ordering may change as the characteristics of the data in the job change.
作业永远不会打破顺序运行,并且如果一个作业失败了,TWS可以在操作员少量参予甚至不参予的情况下对之进行恢复。
Jobs never run out of sequence, and if a job fails, the TWS handles the recovery process with little or no operator intervention.
通常,批处理作业按顺序处理记录,从第一条记录开始,依次处理其余记录,直到工作完成。
Typically, a batch job will process records sequentially, starting with the first record and cycling through the remainder until the work is complete.
它包括作业名称、作业执行次数、处理的行数、错误或成功状态、开始时间及完成时间,这些都是按顺序描述的。
It includes job name, job execution times, number of rows processed, error or success status, time started, and time completed, which are all described in sequence.
使用4个不同的优先级我们发现,每个作业按照优先级顺序完成。
With four different priorities, we see the effect of the different niceness values as each job finishes in priority order.
newSingleThreadExecutor创建的线程池对需要按顺序执行的作业非常有用。
NewSingleThreadExecutor creates a pool that's useful for jobs that need to be done sequentially.
Oozie工作流是放置在控制依赖DAG(有向无环图Direct Acyclic Graph)中的一组动作(例如,Hadoop的Map/Reduce作业、Pig作业等),其中指定了动作执行的顺序。
Oozie workflow is a collection of actions (i.e. Hadoop Map/Reduce jobs, Pig jobs) arranged in a control dependency DAG (Direct Acyclic Graph), specifying a sequence of actions execution.
每个作业的卡片布置是按照如下顺序进行的。
The arrangement of CARDS for each job is in the following order.
ShipPriority作业分析以某些发货方式发货的订单的优先顺序。
The ShipPriority task performs analysis of order priorities within certain shipping modes.
明确作业活动的任务以及输出的内容、顺序、结果等。
Specify the outcome, content, sequence, and task of work activities.
根据设备占地、物流占地、操作者空间、工位前后顺序等在每个作业区内,利用CAD作图进行设备布置模拟。
According to the space of the equipments, logistics, and the worker, the sequence of the working place, simulate the equipments layout in work area use the CAD drawings.
将用双线作业,需调整装舱顺序。
There will be two loaders at work. It needs to adjust loading sequence.
制造车间作业计划就是确定工件的加工顺序,确定机器加工每个工件的开始时间和完成时间。
The job planning in a manufacturing workshop is to fix on the machining sequence, the starting time and finishing time for each part.
给出了清理三角债网络模型的图上作业法,以解决为清理三角债所需投入的最少资金以及清理顺序。
A graphic operation method is devised which helps to settle the minimum input of capital for clearing the debts and the order of their clearing.
因为双线作业,需调整装舱顺序。
Due to two loaders at work, we need to adjust loading sequence.
用来决定执行绪执行顺序的排程演算法详细资讯因作业系统而异。
The details of the scheduling algorithm used to determine the order in which threads are executed varies with each operating system.
示范为何转换作业的顺序很重要。
Demonstrates why the order of transform operations is important.
应用推荐