更高的作业标准将推高石油公司的生产成本,无论是全球还是国内都是如此,邱说。
The higher working standards will push up production costs for oil companies, both globally and at home, said Qiu.
另外,介绍了带电作业标准的制订情况。
In addition, the complexion of enacting standards for live working is described.
现场作业标准是“油井管工程”的重要内容。
The on-site operation standard is an important content of "OCTG Engineering".
在支持部门的帮助下,定义和批准生产线的工作标准,监督操作工按照作业标准进行操作,任何违背标准的给予纠正指导。
Define and approve the standard of production line with the help of supporting department, control the standard in the operation, give correction if there is any action different with standard.
你感觉这是对‘标准作业’的合适而有用的解读吗?
Do you feel that this is an appropriate and useful interpretation of 'standard work'?
joblist类基于选择标准提供作业列表。
The JobList class provides a list of jobs based on selection criteria.
这一体系的总方针是认真负责,严格管理,遵章守纪,标准作业。
The general principles of the system are: complete responsibility, strict management and discipline, and standard operation.
布尔汉称:“这名飞行员严重违反了标准作业规范,置乘客安全于不顾,我们为此道歉。”
"The pilot had committed serious violation of standard operation procedure that endangered passengers," Burhan said. "We apologize for the discomfort."
在分析装配线规划内容的基础之上,提出了基于标准作业时间及系统仿真的装配线规划方法并开发了相应的原型系统。
Based on the content analysis of assembly line planning, a method for assembly line planning based on standard work time and simulation is proposed, and a corresponding prototype system developed.
研究女性手工搬举的最大可接受重量,为手工搬举作业劳动负荷标准的制定提供参考依据。
To study the Maximum acceptable weight of lift(MAWL)in females and to provide a basis for drafting occupational health standard of manual lifting tasks.
本文论述了高层建筑住宅现浇钢筋混凝土外墙外保温板施工的作业条件、操作程序及质量标准,对指导实际工程施工具有一定的指导作用。
This paper discusses the work condition, operation procedure, and Quality standard of heat preservation board construction on outside wall of reinforced concrete in high building.
所有的书面作业都必须打字、使用两倍间距及标准的边界设定。
All written work should be typed and double-spaced, with standard margins.
如果想要的话,您还可以使用标准的DataStage实用工具对每个阶段和链接使用描述性名称定制作业。
If desired, customize your job with descriptive names for each stage and link using standard DataStage facilities.
最后,建立了综合评价模型和标准,对高温作业环境职业适应性进行定量化综合评价。
At last, a synthetic model of evaluation and a standard are established. So the occupational adaptability in the hot work environment can be synthetically evaluated by quantitative analysis.
按照标准DataStage步骤编译、验证和运行作业。
Follow the standard DataStage procedures to compile, validate, and run your job.
根据从现场获得的数据,应用MOD法确定了各动作的标准作业时间。
With the dada collected from the production line, MOD method is used to determine the standard operational time for each activity.
Bash: Bash是标准BourneShell的替代Shell,并且与之具有类似的语法,但同时具备大量的新特性,包括别名、作业控制以及文件和目录名自动完成。
Bash: Bash is an alternative shell to the standard Bourne shell with similar syntax, but an expanded range of features, including aliasing, job control and auto-completion of file and directory names.
研究起草作业场所职业卫生监督检查、职业危害事故和有关行政处罚的法规、标准;
to study and draft regulations and standards for related supervision and inspection, as well as occupational hazardous accidents and related administrative penalties;
新冷库将采用世界最先进的理念设计及最尖端的技术建造,建成后能达到各种国际国内食品储藏和作业相关标准的要求。
The new cold store will use "Worlds best practice" design and construction techniques, and will meet all domestic and international standards for food storage and handling.
旋转吊具是专门为桥式起重机、浮式起重机、以及门座式起重机而配套设计的。适用于ISO标准20英尺、40英尺和45英尺集装箱装卸作业。
Rotating spreader is specially designed for bridge cranes, floating cranes, and gantry cranes. It is applicable to ISO standard 20 feet, 40feet, 45feet container.
在轿车总装流水线条件下,根据作业性质将标准工时划分为增值时间与非增值时间。
Under the condition of vehicle general assembly line, standard time is divided into value-added and non-value-added time.
FSW操作技能达到合格标准。能够完全按照产品作业指导书的要求焊接型材。
Working skill of FSW reaches the passing degree. Weld profile according to the working instruction of a product fully.
结果表明:该工程能使车间作业场所的所有污染物均达到排放标准。
The results showed that the project could let all the pollutants from the workshop meet the emission standards.
作业成本法与传统的成本计算法的根本区别是对间接资源的分配标准不同,即以成本动因作为标准。
The difference between Activitybased Costing and the traditional costing calculation lies in the allotment criteria of the resource, i. e, it regards cost drive as the allotment criterion.
本文认为,订单拣选作业作为标准仓储中心花费最大的一项活动,是仓储运作效率管理的重要环节。
The author points out that order-picking is the most costly activity in a standard warehouses center, and it has great significance for the efficiency management of the warehouses center.
结果表明,疗养期和作业期矿工的平均每日热能摄入量分别达到其供给量标准的156%和97%。
The results showed that their mean daily intake of energy of sanatory stage and work stage had reached 156% and 97% of the recommended dietary allowance respectively.
结果表明,疗养期和作业期矿工的平均每日热能摄入量分别达到其供给量标准的156%和97%。
The results showed that their mean daily intake of energy of sanatory stage and work stage had reached 156% and 97% of the recommended dietary allowance respectively.
应用推荐