文章提出了用任务层次结构具体描述、控制电气工程设计过程的方法。
This paper proposes an approach to represent the process knowledge for electrical engineering design by using task hierarchy structure.
TreeModel负责某些任务,比如连接到数据源、延迟加载、以及从Tree小部件查询条目和条目层次结构。
TreeModel is in charge of certain tasks, such as connecting to the data source, lazy loading, and querying from the Tree widget about items and the hierarchy of items.
选择组织方案并填充术语层次结构是富有挑战性的任务。
Selecting an organizational scheme and populating term hierarchies are challenging tasks.
改良后工业时代的课堂,作为未来的工厂工人的训练场上,教任务,服从,层次结构和时间表。
The industrial-era classroom, as a training ground for future factory workers, was retooled to teach tasks, obedience, hierarchy and schedules.
还结合所提出的层次式多网络模型,对基于任务的神经网络的自适应结构方案、发展前景与存在的问题作了详细的比较研究。
With the Layer Multinet Model proposed by our research group, we investigated task based algorithms for constructive neural networks, their perspective, strength and weakness.
还结合所提出的层次式多网络模型,对基于任务的神经网络的自适应结构方案、发展前景与存在的问题作了详细的比较研究。
With the Layer Multinet Model proposed by our research group, we investigated task based algorithms for constructive neural networks, their perspective, strength and weakness.
应用推荐