配合项目经理和产品设计工程师,计划,管控和追踪工程项目。
Co-operate with project managers and product design engineers to plan, control and track the engineering projects.
youdao
向产品设计总经理汇报。
The PE is reporting to the Design GM.
应用推荐
模块上移
模块下移
不移动