• 货船上的甲板起货机工作时消耗电功率很大,且随时间发生不规则的波动,对决定船舶主电站的配置有着直接影响。

    The deck cargo gear onboard cargo ship consumes a lot of power, which fluctuates irregularly as time goes on. It effects directly the selection of the ship's power plant.

    youdao

  • 其优点在于这些更小的电站可以位于主电网之外,提供给农村的用户。

    The advantage is that these smaller plants can be located off the main electric grid to supply rural customers.

    youdao

  • 在结古镇主街上,幸存者涌进公用电话亭给亲属朋友们拨打免费电话,有的则到手机充电站中为自己的手机充电。

    Survivors packed temporary phone booths and charger stations on Gyegu`s main street, trying to make free calls to relatives and friends or recharge their cellphones.

    youdao

  • 在结古镇主街上,幸存者涌进公用电话亭给亲属朋友们拨打免费电话,有的则到手机充电站中为自己的手机充电。

    Survivors packed temporary phone booths and charger stations on Gyegu's main street, trying to make free calls to relatives and friends or recharge their cellphones.

    youdao

  • 本文简要介绍了电站接入系统和电气主接线设计及其优化过程,以及开关站位置的选择。

    The paper briefly introduces plant connecting into system, electric busbar connection design and their optimized process, as well as switch station site selection.

    youdao

  • 主变非电量测控系统是适应电力调度自动化、变电站实现无人值班化和综合自动化的一种新型自动测控系统。

    Non-electrical quantity detecting system is a new auto-control system that adapt automation of electric scheduling, self-service and integrating automatism in substation.

    youdao

  • 变电站电气主接线作为电力系统中输电和配电环节中重要的能量传输点,是电力系统的重要组成部分。

    As the important energy transfer point for the power transmission and distribution, substation main electrical wiring system is an important part of the power system.

    youdao

  • 本文所介绍的控制管理系统的控制对象是一个小型水电站,该电站由四台水轮发电机组和一台主变压器组成,全站采用分布式控制。

    The article introduces the control and management system of a small water power station. Th is station uses distributed control with four groups of generator and one group of main transformer.

    youdao

  • 高坝洲水电站经过改造后的电气主接线大大提高了电站经济效益、系统稳定性、操作灵活性。

    Through the reform of the main electrical connection, the economical effect, operating stability and flexibility of Gaobazhou hydropower station are notably improved.

    youdao

  • 核电站反应堆主泵是一回路的关键设备,其设备状态的优劣将直接影响核电站的安全和运行。

    Reactor primary Pump is the important equipment in the primary circuit, its working quality would directly influence the safety and operation of nuclear power plant.

    youdao

  • 核主泵是核电站核岛一回路系统的核心,对核反应堆的安全运行起着至关重要的作用。

    The main pump is the core of the first loop in a nuclear power plant, and it plays a vital role on the safety of the nuclear reactor operation.

    youdao

  • 介绍了一种用于变电站自动化系统中的通用测控装置,重点介绍了CPU主模板中PLC模块的实现。

    A universal measurement and control equipment for automatic system of the substation is introduced. The realization of the PLC module in the CPU master module is presented emphatically.

    youdao

  • 通过对实现调度遥控“五防”的几种方案进行分析,提出了建立调度主站与变电站一体化的复合“五防”体系的建议。

    Upon analysis of several realizing schemes, this paper suggests the establishment of complex electric misoperation prevention system integrating dispatching master station and substations.

    youdao

  • 变电站所用电系统全停故障将对变电所主变冷却器、保护、通讯、自动化等设备产生严重影响。

    The outage of substation auxiliary power system has severe impact on the main transformer coolers, protection, communication and automation systems of substation.

    youdao

  • 介绍了福禄河五级水电站电气主结线的设计。

    Introduced the electric main wiring design of the Fuluhe river 5th step hydropower station.

    youdao

  • 在变电站综合自动化工程设计中,对于主变压器分接开关位置的显示,常规方案是需加装档位变送器。

    In engineering design of integrated automation of substation, the display of tap changing switch position for main transformer is to add position transducer in the conventional scheme.

    youdao

  • 随着城市建设用地的日趋紧张,城市轨道交通的主变电站设置在地下将会是一种很好的解决方案。

    In the first phase of Shenzhen metro construction, there are two 110 kV main substations with the same equipment configuration.

    youdao

  • 电气主接线方案的选定,对水电站电气部分设计具有非常重要的意义,是水电站电气部分设计的重要环节。

    Selecting the electric main wiring plan has very important sense to the electric part design of the hydropower station, and in the key link of the electric part design of the hydropower station.

    youdao

  • 该系统将自动化主站系统的技术引入变电站,构建了变电站自动化系统。

    In this system the technology of automatic master station is used for the substation and on this basis a substation automation system is constructed.

    youdao

  • 核主泵是压水型反应堆核电站中的核心设备之一。

    The nuclear reactor coolant pump (RCP) is one of the core equipments in PWR nuclear Power Plant.

    youdao

  • 在万家寨水电站投运不久,先后发现三台主变压器绝缘油色谱分析总烃超标,存在过热缺陷。

    Soon after commissioning of Wanjiazhai Hydropower Station, it was found that the over hot problem existed in three transformers.

    youdao

  • 江苏沙河抽水蓄能电站上水库主、副坝为混凝土面板堆石坝。

    In Jiangsu Shahe Pumped-storage Power Plant, both main dam and auxiliary dam of upper reservoir are rockfill dam with concrete slab.

    youdao

  • 由主低压配电柜开始配线,主低压配电柜位于低压变电站。

    Distribution will be done from the Main Low Voltage Distribution Panel (MLV), located in the LV Substation.

    youdao

  • 系统由主站系统、变电站电压无功实时控制子系统(VQC)和通信子系统构成。

    This system consists of main station system, voltage and reactive-power real-time control subsystem(VQC)and communication subsystem.

    youdao

  • 该系统由主站系统、变电站电压无功实时控制子系统(VQC)和通信子系统构成。

    This system consists of main station system, voltage reactive real-time control subsystem (VQC) and communication subsystem.

    youdao

  • 概述了天湖水电站的厂房布置及主厂房在施工、运行交叉应用工况下的主要结构设计情况。

    This paper introduces briefly the layout of the power house and the main structure design condition of the main power house under the circumstances of construction, operation and cross application.

    youdao

  • 二滩水电站已全部投运的6台机转轮经停机检查,现场焊接的主焊缝无裂纹。

    The runners of 6 operated generating unit of Ertan Hydro Station have been checked and no crack on the primary weld of the field welding position is observed.

    youdao

  • 全面地介绍了新疆吉林台一级水电站工程主厂房排架的布置及设计情况。

    The layout and design of the bent structure of Powerhouse of Jilintai No. 1 Hydropower Station were expounded in this paper.

    youdao

  • 核电站反应堆冷却剂泵(又称核主泵)是核岛中的唯一旋转核心设备,其运行的可靠性与否直接影响到核电站的安全性。

    The reactor coolant pump in nuclear power plant is the only revolving equipment in the nuclear power plant. Its functional stability will directly affect the security of nuclear power plant.

    youdao

  • 核电站反应堆冷却剂泵(又称核主泵)是核岛中的唯一旋转核心设备,其运行的可靠性与否直接影响到核电站的安全性。

    The reactor coolant pump in nuclear power plant is the only revolving equipment in the nuclear power plant. Its functional stability will directly affect the security of nuclear power plant.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定