• A new measure to deal with wet-collapsing loess on slope of site base was proposed in design of tailings site of ore-dressing plant of XISCO.

    通过对宣化钢铁公司小吴营选矿厂尾矿库工程设计提出新的处理坝基岸坡湿陷性黄土措施

    youdao

  • A new measure to deal with wet-collapsing loess on slope of site base was proposed in design of tailings site of ore-dressing plant of XISCO.

    通过对宣化钢铁公司小吴营选矿厂尾矿库工程设计提出新的处理坝基岸坡湿陷性黄土措施

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定