In Xishuangbanna the new Jinghong dam has just started operating. Further up, Xiaowan dam will be finished by 2013.
西双版纳的景洪大坝刚刚开始施工。
So far, based on the above theories, this system has been implemented successfully in the construction of Xiaowan Dam, and it works very well.
目前,基于上述理论研发的用于小湾水电站大坝浇筑期物资调运管理系统实施已经基本完成,在各个部门正常运行。
There are two sets of vertical shearing planes and one set of relaxed fissures dipping towards the river course in the rock mass at the Xiaowan dam site.
小湾岩体存在两组垂直结构面和一组倾向河道的卸荷裂隙。
The result shows that with the help of inducing joint, the stress distribution nearby the dam heel is evidently improved while the integral stability factor of Xiaowan dam is slightly influenced.
结果表明:设置诱导缝,能有效地改善坝踵附近的应力分布,且对拱坝的整体稳定安全度影响很小。
The technical difficulty in flood discharging energy dissipation of the Xiaowan arch dam body leads the world and its plunge pool optimization design is also a major difficult problem of the project.
小湾拱坝坝身泄洪消能的技术难度已达世界当前最高水平,其水垫塘的优化设计亦是工程中的一大难题。
Xiaowan arch dam is the highest arch dam in impoundment period in China.
小湾拱坝是当前我国已进入蓄水阶段的最高坝。
The responses of Xiaowan arch dam are analyzed under seismic wave of oblique incidence.
分析了斜入射地震波作用下小湾拱坝的地震反应。
The responses of Xiaowan arch dam are analyzed under seismic wave of oblique incidence.
分析了斜入射地震波作用下小湾拱坝的地震反应。