For high permeability and loose sand in bohai, these links are composed of wire wrapped screen, gravel packing zone, perf, skin and near wellbore undisturbed formation.
具体到渤海高渗透疏松砂岩,这些环节包括绕丝筛管、砾石充填层、射孔孔眼、压实带及近井原状地层。
For high permeability and loose sand in bohai, these links are composed of wire wrapped screen, gravel packing zone, perf, skin and near wellbore undisturbed formation.
具体到渤海高渗透疏松砂岩,这些环节包括绕丝筛管、砾石充填层、射孔孔眼、压实带及近井原状地层。
应用推荐