• If cost accounting is performed only at the mine level and the workshop level, it would be not easy to know the consumption of bulk raw materials and consumables in a mechanized open pit mine.

    只进行矿、车间二级核算,对于机械化的露天矿山,无法分析清楚大宗原、燃物料的消耗情况。

    youdao

  • Finally, with analysis and argumentation, this thesis attempts to construct a model of the hardware compositions of the workshop-level distributed power line carrier communication control subsystem.

    最后,在现有的分析及论证的基础上,建立了一个车间级分布式电力线载波通信控制子系统硬件组成模型。

    youdao

  • Finally, with analysis and argumentation, this thesis attempts to construct a model of the hardware compositions of the workshop-level distributed power line carrier communication control subsystem.

    最后,在现有的分析及论证的基础上,建立了一个车间级分布式电力线载波通信控制子系统硬件组成模型。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定