• This program can make designing calculation, selecting components and drawing into one and shorten its designing period, lighten work strength.

    该程序实现了设计计算、部件选型和绘制图纸的一体化,并可缩短设计周期,减轻工作强度。

    youdao

  • With the competition of international shipping market, the workload and work strength are soaring, which significantly affect the safety of navigation.

    随着国际航运市场的竞争步伐,船员的工作量和强度越来越大,严重影响航行安全。

    youdao

  • In the initial of operation, calculation step is 0. 5 day, and gradually, it reaches 30 days so as to reduce calculation work strength in the premise of guarantee calculation precision.

    运行初期计算步长为0.5天,逐渐增加到30天,以便在保证计算精度前提下减小计算工作量。

    youdao

  • In the initial of operation, calculation step is 0. 5 day, and gradually, it reaches 30 days so as to reduce calculation work strength in the premise of guarantee calculation precision.

    运行初期计算步长为0.5天,逐渐增加到30天,以便在保证计算精度前提下减小计算工作量。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定