• The aim of this work is to propose an effective method for the solution of the cyclic scheduling problem of boiler system with decaying performance.

    针对性能时间衰减锅炉蒸汽系统循环调度问题进行了研究。

    youdao

  • The aim of this work is to propose an effective method for the solution of the cyclic scheduling problem of boiler system with decaying performance.

    针对性能时间衰减锅炉蒸汽系统循环调度问题进行了研究。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定