Document routing consists of processes, work nodes, work lists, and work packages.
文档路由由过程、工作节点、工作列表和工作包组成。
You can specify the order of the work packages in the work list by priority or date.
可以按照优先级或者日期规定工作包在工作列表中的顺序。
The number of work packages returned in a work list is defined by the system administrator.
工作列表返回的工作包的个数由系统管理员定义。
A notify state is when work packages have been at the node for longer than the time specified by the administrator.
如果工作包在该节点上的时间超过了管理员规定的时间,那么它会进入通知状态。
The WBS divides the scope of the project work into smaller, manageable work packages for maintaining better control of the project activities.
它将项目工作范围分解成更小的、易于管理的工作包,以提高对项目活动的控制力。
The WBS is decomposed into work packages.
工作分解结构最终分解为工作细目。
A. Final output is described in terms of work packages in the WBS.
最终输出是用WBS中的工作包来说明的。
This is the process necessary for aggregating the estimated costs of individual activities or work packages to establish a cost baseline.
这是汇总各单个活动或工作细目的估算费用和制定费用基准所必需的过程。
The planned work contained within the lowest-level WBS components, which are called work packages, can be scheduled, cost estimated, monitored, and controlled.
属于工作分解结构底层组成部分的计划工作叫做“工作细目”,可以安排在进度表中,估算费用,监视和控制。
The planned work contained within the lowest-level WBS components, which are called work packages, can be scheduled, cost estimated, monitored, and controlled.
属于工作分解结构底层组成部分的计划工作叫做“工作细目”,可以安排在进度表中,估算费用,监视和控制。