Currently, it often takes months to get these work orders pushed through.
目前,完成这些工作常常需要几个月的时间。
They then deploy their manufacturing schedules by issuing work orders to dedicated resources.
然后他们向特定的资源发布工作指令,以此来部署他们的制造时间表。
These work orders specify only the items to be produced and need not specify process details.
这种工作指令只需指定要生产的产品,无需指定流程细节。
The production department issues work orders for each of the tasks that must be executed to produce the required items.
生产部门为每一个任务——为了生产所需产品而必须执行的——发布工作指令。
There is a print/fax/EDI use case: The user can select some work orders and print/fax/EDI in the WebSphere Portal page.
这里有一个打印/传真/EDI用例:用户可以在WebSpherePortal 页面选择一些工作订单,然后进行打印/传真/EDI。
Understands work orders requirements.
理解工作订单要求。
Schedule manufacturing orders and work orders automatically.
并自动地排定生产订单和工票。
Manage bill of materials, plan manufacturing orders, track work orders.
管理物料表、计划生产订单、追踪工票。
Complete work orders for maintenance repairs and submit to Engineering. Contact Engineering directly for urgent repairs.
完成维修工作单并送到工程部,如情况紧急,直接与工程部联系。
Prepares PM work orders and follows up work orders on a daily basis. Advisees the Director of Engineer on any problems or delays.
每天准备项目管理工作定单并跟进工作定单。将任何问题或延迟告知工程总监。
The metric is derived by adding the operations per second in the dealer domain to the work orders per second in the manufacturing domain.
该度量是通过将经销商域(dealerdomain)中每秒的操作数与制造商域(manufacturing domain)中每秒的工作订单(work order)数相加而得到的。
If a company dedicates its production resources to produce specific items, it doesn't need to pass along process information with work orders.
如果一个企业只将自己的生产资源用于生产特定产品,那么它就不需要随工作指令一起传送流程信息了。
Raise work orders in MAXIMO in time when problems are found, issue PTW with high quality based on maintenance scheduled plans for each stations.
发现问题时,及时填报MAXIMO工单,严格按照维修计划,高质量签发作业许可证。
This chapter shows how FFA users can actually manage the resources, the work orders, the dispatching process and the field technician activities.
这一章展示了FFA的使用者怎么来管理资源、工作订单、调度进程和现场技术人员的活动。
More than 200 stop-work orders have been issued across the country, suspending $10.5 billion-worth of projects in the middle of the building season.
全国各地签发的停工令有200多个,致使价值达105亿美元的工程在施工季节暂时停工。
If additional production is required, the process-execution layer uses the bulkProductionWO bean to issue additional work orders for bulk-production items.
如果需要补充生产,流程执行层会使用bulkProductionWObean为批量生产的产品发布工作指令。
Production documentation control: issue, tracking, collection and verification of production work orders and task cards used in maintenance and supporting activities;
生产文件控制:负责发放、追踪、收集和核对在维修和支援工作中使用的工作指令和任务单卡。
Production documentation control: issue, tracking, collection and verification of production work orders and task cards used in maintenance and supporting activities;
生产文件控制:负责发放、追踪、收集和核对在维修和支援工作中使用的工作指令和任务单卡。
应用推荐