Tasks at a high level such as "Build QA Environment" are OK for a work breakdown list.
“构建QA环境”等高级别任务可以采用工作划分列表。
The example "Agile Kanban" in Figure 5 is a work breakdown, and it works well within the team.
图5中“敏捷看板”的例子是一个工作的分解,它在团队内部工作良好。
These may be within the context of a particular project, proposal or work breakdown structure element.
这些可能在一个特定项目、提议或工作分解结构元素的上下文环境中。
Tom Mochal offers some practical advice to save you time and rework on your next work breakdown structure.
TomMochal提供了5点实践性的建议,下次进行工作分解结构设计时,你可以拿来参考节省时间。
RMC also supports different presentations for processes, such as work breakdown structure or workflow presentations.
RMC还支持不同的过程表示,比如工作分解结构或工作流表示。
The key parts of the SPP module are work breakdown structure (WBS) and the software estimation.
其中的重点是工作分解(WBS)和软件项目估计。
See also work package, control account, contract work breakdown structure, and project summary work breakdown structure.
另外请见工作细目、控制帐目、合同工作分解结构和项目概括性工作分解结构。
For the third step in the creation of the capability patterns and delivery processes, a work breakdown structure (WBS) is created.
对于能力模式和交付过程的创建中的第三步,会生成一个工作分解结构(work breakdown structure,WBS)。
A work breakdown structure (WBS) is the best way to understand the detailed work of a project when you have to build a schedule from scratch.
当你需要从草稿中拟定出日程表时,工作分解结构(WBS)是理解项目工作细节的最好方式。
Figure 17 shows a typical Timesheet view that displays work assignments by project, the work breakdown structure and corresponding data for each task assignment.
图17显示了一个典型的工时单视图,展示了计划好的工作分配情况、工作分解结构和每个任务分派相应的数据。
A work breakdown structure (WBS) is defined. This is a list of tasks that, if performed, will generate all of the work products needed to build the software.
定义工作分解结构(WBS)。这是一张任务列表。如果这些任务得到执行,将会产出工作产品,而这些工作产品是形成软件所必须的。
And the example of "Lean + Agile Kanban" in Figure 7 used with Figure 8 shows a combination of a feature breakdown in the upper level and a work breakdown in the lower level.
图7中“精益+敏捷看板”的例子与图8一起展示了上级功能分解和下级工作分解的结合。
You are a project manager for a new product development project that has four levels in the work breakdown structure, and has been sequenced using the arrow diagramming technique.
你是一个新产品开发项目的项目经理,这个项目的工作分解结构有四个层次,并按顺序使用箭线图技术。
Introducing the concept of WBS (Work Breakdown Structure) into the project quotation software will greatly improve the accuracy of project cost estimation and the efficiency of cost control.
将项目管理中的WBS(工作分解结构)概念引入到工程报价软件中,将大大提高工程造价计价的准确性和造价控制的效率。
Introducing the concept of WBS (Work Breakdown Structure) into the project quotation software will greatly improve the accuracy of project cost estimation and the efficiency of cost control.
将项目管理中的WBS(工作分解结构)概念引入到工程报价软件中,将大大提高工程造价计价的准确性和造价控制的效率。