• Integrated tradeoff for preventive maintenance is a kind of decision-making analysis for preventive maintenance of whole system as well as all the parts of it during the design phase of materials.

    预防性维修综合权衡就是在装备设计阶段整个系统以至各组成单元做出预防性维修决策分析

    youdao

  • Inventory analysis is an important segment of life cycle assessment, which is a quantitative analysis process used in resource, energy and environmental discharge of the whole life cycle phase.

    清单分析生命周期评价方法中极重要环节,是整个生命周期阶段资源能源使用环境排放定量分析过程

    youdao

  • By SEM analysis, the addition of CA improved the mutual disperse of TPS and PE, and there also isn't obvious phase interface. So TPS and PE formed an evenly continuous phase system on the whole.

    扫描电镜分析结果表明,CA加入改善了淀粉的塑化程度,提高了TPSPE中的分散分散性,同时TPSPE之间也没有了明显界面,基本上形成了一个均匀的连续相体系。

    youdao

  • In the design phase, a whole Top-Down analysis and module design was done, and finally the circuit of the Baseband module was realized and tested.

    接着对系统进行了顶层设计逐步细化,最终完成基带电路板制作调试。

    youdao

  • In the design phase, a whole Top-Down analysis and module design was done, and finally the circuit of the Baseband module was realized and tested.

    接着对系统进行了顶层设计逐步细化,最终完成基带电路板制作调试。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定