• After roller compaction, the wet density of RCC would be measured by sampling from the digged pit or by nuclear densimeter.

    碾压后,挖坑取样或采用核子密度水分计选点测量碾压混凝土的湿密度。

    youdao

  • The relationship between erosion rates and shear stress was determined by the particle composition, structure, wet density and water content of the sediment.

    沉积物的颗粒组成、结构、密度、含水率等决定了冲刷率与剪应力的变化关系。

    youdao

  • The relationship between erosion rates and shear stress was determined by the particle composition, structure, wet density and water content of the sediment.

    沉积物的颗粒组成、结构、密度、含水率等决定了冲刷率与剪应力的变化关系。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定