• Horizontal holes were drilled into the wet soil and liquid nitrogen was pumped in, freezing the water until the tunnel could be dug and cemented.

    湿土壤水平的打一些然后泵入液氮进行冷冻直到隧道可以挖掘用水泥封住

    youdao

  • Horizontal holes were drilled into the wet soil and liquid nitrogen was pumped in, freezing the water until the tunnel could be dug and cemented.

    湿土壤水平的打一些然后泵入液氮进行冷冻直到隧道可以挖掘用水泥封住

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定