• Both factors reduce wait times at the wellsite.

    这两点因素都可以减少在井场的等待时间。

    youdao

  • Some tools, such as the gamma ray, are calibrated only at the wellsite.

    某些测井仪器只在井场进行刻度,如自然伽马测井仪器。

    youdao

  • The device used to store and transport a coiled tubing string ready for use at the wellsite.

    存放和运送挠性管柱使它随时可在井场使用的装置。

    youdao

  • The paper presents an effective way to predict formation pore pressure at wellsite-normalized drilling rate.

    该文介绍了一种现场预测地层孔隙压力的有效方法NDR标准化钻速法。

    youdao

  • Construction of wellsite composite information platform is the necessity for petroleum geologic exploration and development drilling.

    构建井场综合信息平台是现代石油地质勘探与开发钻探的需要。

    youdao

  • The practice shows that the method is a relative good one for wellsite logging personnel interpretation in the coring interval.

    实践证明,利用此方法可为现场录井人员对取心段的解释提供相对准确的数据。

    youdao

  • The push to manage more wells with fewer people at the wellsite presents numerous challenges from organizational and human factors perspectives.

    想要在井场以更少的人管理更多井,则无论是从组织上,还是从人的因素上都提出了许多的挑战。

    youdao

  • The efficiency gains are made possible by higher logging speeds, reduced set-up and calibration times, and faster turn-around on wellsite processing.

    更高的测速、更少的组装与刻度时间以及更快的现场处理周期使得效率得以提高。

    youdao

  • It proves by the examples that the method is correct, fast and effective, it can provide experience for wellsite operators to determine palaeo water flow direction quickly.

    通过应用举例,证实该方法准确、迅速、有效,为现场工作人员提供了快速确定古水流方向的经验。

    youdao

  • As to the origin and the mechanics of total gas curve "negative shift" from TDC comprehensive logging unit, we have an initial recognition of it by theoretical and wellsite test.

    对于TDC—综合录井仪的气测全量曲线“负漂”成因机理,通过理论分析和现场试验,有了初步认识。

    youdao

  • With the characteristics of logging wellsite service, every mud logging company and related units are carrying on the research and construction for logging data realtime remote transmission.

    针对录井现场服务的特点,各家录井公司及相关单位都在着手录井数据远程实时传输系统研究与建设工作。

    youdao

  • Baker Hughes assigns a dedicated wellsite coordinator and project manager responsible for overseeing the project, resulting in better execution efficiency and improved overall communications.

    贝克·休斯公司会派驻一名兼管井场作业协调的项目经理来负责监督方案实施,保障作业队伍内部的有效沟通,进而确保方案更好的实施效果。

    youdao

  • Sensors and motor controllers interface with a site communications box, which transfers data via satellite in real time between the wellsite and data servers, both of which can be remotely controlled.

    传感器和电机控制设备与现场通信盒相连,通过卫星在井场和服务器间传输数据,二者均可远程控制。

    youdao

  • Wellsite calibration, temperature and pressure correction must be made while the sensor is used in the borehole.

    这种机电一体化的流体密度传感器在井下应用时必须进行井场刻度以及温度和压力的校正。

    youdao

  • Wellsite calibration, temperature and pressure correction must be made while the sensor is used in the borehole.

    这种机电一体化的流体密度传感器在井下应用时必须进行井场刻度以及温度和压力的校正。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定