Lift BOP stack and replace wellhead connector AX ring.
吊起防喷器组并更换连接器AX密封圈。
Affective wellhead was bred to be polychrome life and sincere life!
情感的水源,孕育了多彩的生活,至诚的生命!
Make preparations for installing the wellhead quickly and killing well.
做好抢装井口和压井准备。
There are not automatic tools for wellhead in the origin design of a drilling rig.
钻机设计、使用初期没有配备自动化井口机具。
For industrial drilling wellhead solidified gel ingredients, improve the viscosity.
用于工业钻探井口凝固胶体配料、提高粘度。
An automated system mounted on the wellhead controls the well on an intermittent flow regime.
装在井口装置上的自动系统把井控制在间歇流动方式。
The Coast Guard wants BP and rig owner Transocean to do further inspections at the wellhead site.
美国海岸警卫队希望英国石油公司以及钻井平台所有者越洋钻探公司,对井口遗址进行深入的检查工作。
When I walked into the well site, I was surprised to see oil and gas blowing out from the wellhead.
我走到井场的时候,看见油气正在从井口往外喷使我大吃一惊。
The present invention is designed to be mounted over a flaming oil wellhead to extinguish the flames.
本发明的目的是将安装在井口燃烧石油熄灭的火焰。
A valve installed in the wellhead assembly to provide access to the casing annulus of non-producing casings.
安装在井口装置中的一个阀。它提供通向非生产套管的套管环形空间的通路。
A new type of intelligent digital recorder for temperature and pressure of wellhead is introduced in this paper.
文章介绍一种新研制开发的智能井口温度压力自动数字记录仪。
If the 450-ton valve at the wellhead can be turned on, the oil flow should stop, and the spill could be ended quickly.
如果井口450吨重的阀门可以可以关上,油流就可以停止,那么溢油很快就可以停下来。
Field use shows that this wellhead is high-temperature - and high - pressure-resistant, and has good performance.
试验与使用表明,这种双管热采井口装置耐高温、高压,密封可靠,取得了良好效果。
Anew forecasting method of wellhead injection pressure for polymer flooding is established based on Dupuit formula.
依据裘比公式建立了一种新的聚合物驱油井口注入压力预测方法。
Meanwhile, the new type of decentralized wellhead is mounted rightly can also avoid the occurrence of wrapping tube.
另外,正确安装合格新式的偏心井口,也可以避免缠、卡的发生。
Wellhead has more than 140 equipments like many CNCs, production center and high-tech equipment and testing equipment.
威含德拥有数控车床,加工中心等高新设备在内的各类加工和检测设备140多套。
The adapter between the first casing string and either the BOP stack (during drilling) or the wellhead (after completion).
在第一根套管柱和防喷器组(钻井时)或完井后的井口之间的一个接头。
It is composed of casing flange, casing cross joint, wellhead valves, tubing hanger, tubing head cross joint and accessories.
这种井口装置由套管法兰、套管大四通、井口阀、油管挂、油管挂体及相关附件组成。
Its drilling system USES a 380-ton protective casing over the wellhead that is about the size of a six-story office building.
它的钻探系统采用了重380吨、约六层办公大楼大小的保护罩(防爆装置)来保护井口。
The base of the injector head is secured to the wellhead pressure-control equipment by the stripper assembly mounting system.
注入头的底部由环状橡胶芯子固定系统固定于井口压力控制设备。
The main measures of groundwater protection are groundwater vulnerability assessment and wellhead protection area delineation.
进行地下水脆弱性分区评价和水源保护区划分是对含水层进行保护的主要手段。
It is necessary for deepwater drilling to analyse the geological data in shallow formation and mechanical stability of wellhead.
有必要通过现场取样获得浅部地层的地质资料,对深水钻井井口力学稳定性进行分析。
The results show the wellhead temperature rises rapidly at the early stage of well opening and then reaches stability gradually.
结果表明,井口温度在开井初期迅速上升,然后逐渐达到稳定;
This paper describes the experience of sizing and performance selecting of electric fire water pump for Chunxiao wellhead platform.
介绍春晓气田群开发建设项目中春晓井口平台电动消防泵的选型过程。
This adapter may be threaded or welded onto the casing, and may have a flanged or clamped connection to match the BOP stack or wellhead.
该接头也许是用螺纹与套管连接在一起,或焊接在一起,以及可能还有一个法兰或卡箍连接与防喷器组或井口配接。
IT HAS been nearly two months since oil started gushing into the Gulf of Mexico from a damaged wellhead 5,000 feet below the ocean surface.
近两个月前,海面5000英尺下的一座油井口损坏后,渗入的原油开始源源不断地涌进整个墨西哥湾、造成了严重的影响。
IT HAS been nearly two months since oil started gushing into the Gulf of Mexico from a damaged wellhead 5, 000 feet below the ocean surface.
近两个月前,海面5000英尺下的一座油井口损坏后,渗入的原油开始源源不断地涌进整个墨西哥湾、造成了严重的影响。
This paper introduces the procedure, mechanism and operation of wellhead tieback techniques and points out the problems necessary to be solved.
本文介绍了井口回接作业的程序、机理、作业施工情况,并指出了需改进的地方。
This paper introduces the procedure, mechanism and operation of wellhead tieback techniques and points out the problems necessary to be solved.
本文介绍了井口回接作业的程序、机理、作业施工情况,并指出了需改进的地方。
应用推荐