The drop simulation for the front plastic shell have been done with take the position of weld line which result from the two relatively optimal projects to the lowest location.
②塑料件前壳试验:将两组较优浇口方案产生的熔接痕位置调整到跌落方向的最低处。
The drop simulation for the front plastic shell have been done with take the position of weld line which result from the two relatively optimal projects to the lowest location.
②塑料件前壳试验:将两组较优浇口方案产生的熔接痕位置调整到跌落方向的最低处。
应用推荐