Common used measures in design of buildings in collapse loess area are mainly focused in three aspects: foundation treatment, waterproofing, and structure.
对湿陷性黄土区的建筑物,其设计措施通常可采取:地基处理措施、防水措施和结构措施三种。
The article analyses the reasons of roof leakage, and proposes the measures of the quality control of the slanting roof waterproofing.
文章分析了屋面渗漏的原因,提出了斜屋面防水质量控制措施。
The article introduces the waterproofing and drainage measures and materials for the dam, the foundation of the per-manent lock and some buildings of the Three Gorges project.
介绍了三峡工程中大坝、永久船闸基础及一些建筑物的防排水措施和所用材料。
Roof waterproofing, construction, major waterproof material, construction craft, the main leakage positions and precautionary measures are introduced.
屋面防水、施工及主要防水材料,施工工艺及渗漏的主要部位、预防措施应加强管理的部位。
Roof waterproofing, construction, major waterproof material, construction craft, the main leakage positions and precautionary measures are introduced.
屋面防水、施工及主要防水材料,施工工艺及渗漏的主要部位、预防措施应加强管理的部位。
应用推荐