By analyzing test data, the vertical bearing capacity, lateral friction and tip resistance of the diaphragm wall foundation were studied.
通过对试验数据分析,得出了地下连续墙基础的竖向承载力、侧摩阻力及端阻力的发挥特性。
The retaining-wall foundation is built on the downstream bank slope of the bridge abutment, which stability cannot meet the requirement of specification.
重力式挡土墙建立在桥台的下游护坡上,墙的基础由桩和筏板构成。
To study vertical bearing behavior of the foundation, a shaft diaphragm wall foundation of bridge in loess area was tested for bearing capacity by use of the self-balanced method.
为研究其竖向承载特性,在国内首次采用自平衡法对黄土地区某桥梁的井筒式地下连续墙基础进行了现场静载试验。
To study vertical bearing behavior of the foundation, a shaft diaphragm wall foundation of bridge in loess area was tested for bearing capacity by use of the self-balanced method.
本文在采用自平衡法静载荷试验的基础上,分别对浙江嘉兴和湖州两个工程中的同一场地挤扩支盘灌注桩与普通直孔灌注桩进行对比试验研究。
On Coach leatherwear's Facebook wall, the company promotes its affiliation with the Breast Cancer Research Foundation.
在Coach 皮具的Facebook 留言板上,这家公司宣传它附属于乳腺癌研究基金。
Based on the experience of the practical design, some measures of design and construction of foundation and shear wall in high-rise building are put forward in this paper.
以实际设计经验总结为基础,对钢筋混凝土高层建筑建筑基础和剪力墙的设计与构造提出了一些具有实用价值的处理措施。
A straw-earth mixture with a low straw content was manufactured with the help of cows and water buffalo and then heaped on top of the foundation wall to a height of 65cm per layer.
一种低秸秆含量的秸秆土混合物在奶牛和水牛的协助下制备而成,然后将其堆砌于基础墙体之上,每层约65厘米高。
The wall and the wall column are connected with galvanized steel, which will not cause the foundation to sink, the wall crack and the collapse phenomenon.
墙体与墙柱用镀锌槽型钢连接,不会因大风大雨造成基础下沉,墙体开裂,倾覆倒垮征象发生。
And on Coach ( COH - news - people ) leatherwear's Facebook wall, the company promotes its affiliation with the Breast Cancer Research Foundation, noting this is "truly a collection with a cause!"
在Coach皮具的Facebook留言板上,这家公司宣传它属于乳腺癌研究基金,说这真的是一个有意义的产品。
The widened section, usually concrete, at the base or bottom of a foundation wall, pier or column.
被加宽的部分,通常是混凝土,在基础墙壁,柱桩或支撑柱体的基础或底部。
This paper presents sand and cobble foundation treatment of overflow dam, guide wall and overflow weir by "high pressure jet grouting" at an in Hydropower Station.
本文主要介绍应用“高喷”技术对安居水电站溢流坝、堰坝导墙、溢流堰天窗沙卵石基础处理的方法和体会。
The problem in the calculation of the vertical load on the upper surface of strip foundation of the load-bearing and non-load-bearing wall in the composite structure is pointed out.
指出了混合结构中承重墙与非承重墙基础顶面竖向荷载计算中存在的问题,分析了影响纵横墙协同工作状态的主要因素。
Based on design and construction of timber residence in Songyuan villas, the foundation, wall, floor and roof construction of wood plate-frame house are introduced in detail.
结合松园别墅木结构住宅的设计和建造,详细叙述了平台式框架木结构的基础、墙体、楼面、屋面构造。
Cement silo is the abbreviation of cement storage silo, which mainly includes foundation, supporting structure, bottom of silo, silo wall and top of silo.
水泥筒仓是水泥储存筒仓的简称。它主要包括基础、支承结构、仓底、仓壁和仓顶。
The continuous concrete wall can be used as an impervious structural wall and as a load bearing foundation wall of a building, so that it has become a basic selection in an underground engineering.
由于地下连续墙既可用作地下工程的防渗挡土结构墙,又可用作建筑物的承重基础墙,所以已成为地下工程的一种基本的选择方案。
This paper deals with the interaction between shear wall and its foundation using finite element method.
本文采用有限单元法对建在多层地基上的剪力墙, 基础和土进行了共同作用分析。
Joint utilization of strip foundation under wall with static press pile is a kind of design and construction plan which can reduce man-hours and building costs.
墙下条形基础与静压桩基结合使用,对于弱地基上的多层混合结构建筑是一种既能缩短工期,又能降低造价的设计、施工方案。
Through comparing several schemes, steel tube-grouting was adopted to reinforce the wall rock and the foundation of the tunnel.
经方案比选,采用钢花管对洞顶及两侧部分的地表和隧道地基与拱脚部位进行注浆加固。
The practical investigation and research on the foundation deformation and wall crack of the buildings are introduced, furthermore, the opinions to treat the foundation are proposed.
对既有建筑物地基变形墙体裂缝实际调查分析地基处理的重要性,对建筑物地基处理提出意见。
Precompressed pile foundation under pinning technique is used to reinforce the foundation and structural wall for adding the building named Xibei hotel from two floors to seven floors in Xian city.
西安市西北大酒店二层客房增加五层,对地基与结构墙体加固补强,采用预压桩托换及钢筋网片夹板墙法。
A wall is only as good as its foundation, and all retaining walls should be built on structurally sound, compacted foundation sub-base material.
墙只是作为一个良好的基础,而应建立在所有挡土墙结构健全,基础压分的物质基础。
Cracks appeared in the wall as the foundation settled.
墙基下陷,墙上出现裂缝。
This paper introduces the treatment for deep dam foundation of the concrete cut off wall, which intensity and elastic modulus value are requirement to satisfy the stress, strain and durability.
本文介绍了砼防渗墙对土石坝深厚覆盖层地基的处理,强调防渗墙砼强度及弹模取值应在满足应力应变的前提下,兼顾耐久性等要求。
The wall panels were bolted to the concrete foundation.
墙壁镶板用螺栓安装在混凝土地基上。
The wall panels were bolted to the concrete foundation .
墙壁镶板用螺栓安装在混凝土地基上。
The present invention is suitable for use in in-situ cast or pre-stressed reinforced concrete floor slab, roof, wall, foundation slab and hollow bridge, especially flat floor slab.
适用于现浇钢筋砼或预应力钢筋砼的楼盖、屋盖、墙体、基础底板以及桥梁使用,尤其适用于无梁楼盖使用。
The present invention is suitable for use in in-situ cast or pre-stressed reinforced concrete floor slab, roof, wall, foundation slab and hollow bridge.
适用于现浇钢筋砼或预应力钢筋砼的空心楼盖、屋盖、墙体、基础底板以及空腹桥梁使用。
The present invention is suitable for use in in-situ cast or pre-stressed reinforced concrete floor slab, roof, wall, foundation slab and hollow bridge.
适用于现浇钢筋砼或预应力钢筋砼的空心楼盖、屋盖、墙体、基础底板以及空腹桥梁使用。
应用推荐